Request for King County Project Information for ESA
|
Project Name: |
||||||||||
|
Department/Division: |
DNR/WLRD |
Agency Project No(s). |
Agency Priority: |
Hi Med Lo |
||||||
|
Scheduled Construction Date: |
Contact person: |
|||||||||
|
Estimated Construction Cost: |
Phone: |
|
||||||||
Please answer the following questions as completely as possible. If the question
is not applicable, check "NA" in the space to the right. Detailed
instructions are included in a separate file entitled "instructions."
If you have any questions, please call Luanne Coachman at KC DNR (296-8381),
Sue Kaufman at KC DNR (296-1989), Randy Sandin at KC DDES (296-6778),
or Kitty Nelson at KC DOT (296-8737). Please send a hard copy or fax
to Luanne Coachman (MS 22G; Fax 296-0192 - No Email please).
The deadline for return is May 7, 1998. Thank you.
|
1. |
Describe the project and its purpose:
|
||||||||||
|
2. |
Check the federal permits needed for your project. List the numbers of the nationwide permits if needed. |
ACOE Nationwide ACOE Individual NPDES (Gen. or Ind.) Other |
N/A
|
Pending
|
Approved
|
||||||
|
3. |
If your project has federal funding, please check FEMA FAA FHWA HUD or list the source: Other |
N/A |
|||||||||
|
4. |
List the names of your partners for the project. Identify the lead agency. FEMA with King County as local sponsor and lead. |
N/A |
|||||||||
|
5. |
Check State and local permits needed for your project. Circle jurisdiction. |
HPA Surface Mining Forest Practices Shoreline (City or County) Shoreline Exemption (City or County) Clearing and Grading (City or County) Building or Subdivision (City or County) Other |
N/A
|
Pending
|
Approved
|
||||||
|
6. |
Which federal, State, or tribal agencies have you contacted regarding your project and its impacts? Describe any modifications to the project as a result of these contacts: |
N/A |
|||||||||
|
7. |
Check Water Resource Inventory Area (WRIA) and river basin or sub-basin (if known) where the project is located: |
WRIA 7 Snohomish WRIA 8 Lk Washington WRIA 9 Duwamish/Green WRIA 10 Puyallup WRIA 15 Kitsap No WRIA # Puget Sound River Basin Subbasin Tributary No. or Name |
|||||||||
|
8. |
What is the specific location of your project? Provide the address, the jurisdiction, and the 1/4 section, section, township, and range. |
||||||||||
|
9. |
Is the project in or within 300 feet of a lake, river, stream or bay, etc.? Name the waterbody. |
N/A |
|||||||||
|
10. |
What is the size of the project (list area or length of disturbance),
the amount of new impervious surface, |
N/A |
|||||||||
|
11. |
Is the project a formal recommendation in a basin plan? Yes No |
N/A |
|||||||||
|
In answering the remaining questions, please describe the impacts assuming no mitigation: IMPACT ASSESSMENT |
||
|
12. |
Describe the beneficial and adverse impacts upon aquatic resources that will be caused by construction of the project: |
N/A |
|
13. |
Describe the beneficial and adverse impacts upon aquatic resources resulting from the maintenance, use, or operation of the project (post-construction impacts): |
N/A |
|
MITIGATION |
||
|
14. |
Will the project alter the water quality of Puget Sound, bays, lakes, streams, wetlands, and rivers (including sedimentation, urban runoff, toxics, turbidity, etc.): Yes No (If yes, answer a and b.)
|
N/A |
|
15. |
Will the project discharge water or generate runoff to Puget Sound, bays,
lakes or a stream or river?
|
N/A |
|
16. |
Are clearing and grading activities part of the project? What is the
length or area of direct disturbance?
|
N/A |
|
17. |
Will the project remove or modify riparian vegetation within 300 feet of the water body? Yes No (If yes, answer a and b.)
|
N/A |
|
18. |
Will the project place a structure within-or cause any change to-the
bed or banks of a body of water?
|
N/A |
|
19. |
Will the project place fill or structures within any 100-year floodplain?
|
N/A |
|
20. |
Will the project divert water to or from the stream, lake, river, or
Puget Sound?
|
N/A |