WAC 468-310-010
General requirements. Contractors desiring
to offer bids for the performance of contracts for the
construction, improvement or repair of a ferry operated by the
Washington state ferries or for the repair, overhaul, or the
dry-docking of any ferry operated by Washington state ferries
must first be prequalified by the Washington state department of
transportation (hereinafter "department") and shall file a
standard prequalification questionnaire and financial statement
(hereinafter "prequalification questionnaire") using forms
furnished by the department. Contractors desiring to offer bids
for the performance of contracts for the construction,
improvement, or repair of ferry terminal facilities shall submit
for consideration a prequalification questionnaire (DOT form
420-010) in accordance with chapter 468-16 WAC. The
prequalification questionnaire shall include a report of the
financial ability of the contractor, its organization, key
personnel, equipment and plant facilities, and experience. Complete answers to all questions and the furnishing of all
information as indicated by column headings or otherwise
throughout the prequalification questionnaire are an essential
part of compliance with these rules. A prequalification
questionnaire from a contractor not previously prequalified under
these rules, who desires to bid on a project must be received no
later than 15 calendar days prior to the bid opening (or such
other time as the department may specify with respect to any
project) in order to receive consideration for that bid opening. The contractor shall authorize the department to obtain all
information which it may deem pertinent with respect to the
contractor's financial worth, assets and liabilities, and the
adequacy of its performance of contracts performed by the
contractor in whole or in part within the preceding three years. The department shall issue a certificate of prequalification to
any contractor found to possess the qualifications prescribed.
Prequalification may be established in any calendar quarter
and is renewable annually. Information submitted in the
prequalification questionnaire will be used to establish the
initial prequalification, classification and maximum capacity
ratings of the contractor for its current fiscal year or
remaining portion thereof plus one additional calendar quarter. Prequalification will be renewed annually thereafter or at other
times as designated by the department.
The department shall not make available for public
inspection and copying financial information supplied by or on
behalf of the contractor for the purpose of qualifying to submit
a bid or proposal as provided herein. The foregoing restriction
shall not, however, prohibit the department from giving such
information in evidence or in pretrial discovery in any court
action or administrative hearing involving the department and the
contractor.
The department may at any time during which the certificate
of prequalification is in effect demand a new prequalification
questionnaire and if the same is not provided within sixty days
of the date of request, the certificate of prequalification held
by the contractor will be considered forfeited and the contractor
will not be permitted to bid on contracts let by the department
for those classes of ferry system construction or repair
enumerated in WAC 468-310-050(6) until a new statement has been
received by the department.
If at any time during the valid period of the certificate of
prequalification the latest prequalification questionnaire on
record with the department ceases to represent fairly and
substantially the financial position or the equipment and plant
facilities of the contractor to whom the certificate was issued,
it shall be the responsibility of that contractor to so notify
the department and to refrain from further bidding on ferry
system construction or repair contracts until their
prequalification has been confirmed or revised. Failure to give
such notice will constitute a violation of these rules.
Qualified contractors shall be notified of impending
expiration of their qualification and will be provided the
necessary questionnaire forms for renewal at least forty-five
days before the expiration date.
The department reserves the right to require a personal
interview with any contractor when considering their
qualifications.
[Statutory Authority: RCW 47.60.680 and 47.60.690. 99-03-025
(Order 189), § 468-310-010, filed 1/11/99, effective 2/11/99. Statutory Authority: 1983 c 133. 83-19-014 (Order 84), §
468-310-010, filed 9/12/83.]