WAC 468-51-105
Variance connection permits. Variance
permits may be issued, at the discretion of the department, for
certain connections not meeting the access classification
location and spacing or that exceed the number of connections
allowed by the standards adopted for a particular highway
segment. These permits may be allowed if conditions warrant and
are demonstrated to the satisfaction of the department by a
traffic analysis, signed and sealed by a qualified professional
engineer who is registered in accordance with chapter 18.43 RCW,
which is included with the connection permit application. The
variance permit will remain in effect unless a new permit is
required due to changes in property site use in compliance with
WAC 468-51-110 or unless permit modification, revocation, or
closure of the variance permitted connection is required as
provided for in WAC 468-51-120. The department may issue a
connection permit requiring a legally enforceable joint-use
connection when it is determined to be in the best interest of
the state for restoring or maintaining the operational efficiency
and safety of the state highway. Variance connection permits
shall specify conditions or limits including, but not limited to:
(1) Traffic volume. The maximum vehicular usage of the
connection shall be specified in the permit.
(2) Users. The permit shall specify the properties to be
served by the connection, and any other conditions as necessary
to carry out the provisions of chapter 47.50 RCW.
[Statutory Authority: Chapter 47.50 RCW. 99-06-034 (Order 187),
§ 468-51-105, filed 2/25/99, effective 3/28/99.]