WAC 468-51-090
Construction requirements. (1)
Preconstruction conference. The department may require a
preconstruction conference prior to any work being performed
on the department's right of way. When required by provisions
in the permit, the department will schedule a preconstruction
conference. The preconstruction conference should be attended
by the necessary personnel to assure compliance with the terms
and provisions of the permit.
(2) Time limit. Substantial construction of the
connection shall begin within ninety days of the effective
date of the permit, unless a longer time is approved by the
department or a time extension is requested by the applicant
and approved by the department. Construction shall be
completed within one hundred twenty days of the date of
issuance of the permit, unless a time extension is approved by
the department. As a condition of the permit, the department
may further limit construction time, if the department
determines that such limitation is warranted. Failure to
comply with the time limits specified in the permit shall
result in an automatic expiration of the permit following
written notification to the permit holder. For any permit
which expires for failure to begin construction or to complete
construction within the specified time limits, the department
may require a new application, including the payment of the
required application fee prior to the initiation of any
construction.
(3) Posting of permit. The approved connection permit
shall be displayed in a prominent location, protected from the
weather, within the vicinity of the connection construction.
(4) Disruption of traffic. All construction and/or
maintenance within department right of way shall conform to
the provisions of the connection permit, the "Manual on
Uniform Traffic Control Devices" (MUTCD); the department's
current "Design Manual," and the current "Standard
Specifications for Road, Bridge, and Municipal Construction."
The department may require or restrict hours of construction
to minimize disruption of traffic on the state highway system.
If construction activity within the department's right of way
causes undue disruption of traffic or creates safety hazards
on a state highway, or if the construction activity is not in
compliance with the traffic control specifications in the
permit, the department shall advise the permit holder or the
permit holder's contractor of the need for immediate
corrective action, and may order immediate suspension of all
or part of the work if deemed necessary. Failure to comply
with this provision may result in permit modification or
revocation.
(5) Traffic signals and other traffic control devices. Traffic signals and other traffic control devices installed by
the permit holder shall conform to MUTCD and department design
and construction standards. The permit holder is responsible
for securing any state and local permits needed for traffic
signalization and regulatory signing and marking.
(6) Connection construction inspection. For Category II
and Category III connections, the department may require the
permit holder, the developer, or landowner to provide
inspection of construction and certification that connection
construction is in accordance with permit provisions and
appropriate department standards by a professional engineer,
registered in accordance with chapter 18.43 RCW, or the
department may do the inspection at the applicant's expense,
as provided in the developer agreement.
[Statutory Authority: Chapter 47.50 RCW. 99-06-034 (Order
187), § 468-51-090, filed 2/25/99, effective 3/28/99. Statutory Authority: RCW 47.01.101 and chapter 47.50 RCW. 92-14-044, § 468-51-090, filed 6/24/92, effective 7/25/92.]