WAC 468-16-210   Prime contractor performance report.  (1) The evaluation of contractor performance shall be made on a form substantially in the format as illustrated herein.

     (2) A Prime Contractor Performance Report Manual provides detailed instructions for preparation of the prime contractor performance report.



 
 


 




[Statutory Authority: RCW 47.01.101, 47.28.030 and 47.28.070. 94-05-004, § 468-16-210, filed 2/2/94, effective 3/5/94; 91-04-014 (Order 128), § 468-16-210, filed 1/28/91, effective 2/28/91.]