WAC 372-36-110   Specific requirements of each industry -- Sand and gravel washing.  No sand and gravel washings will be discharged to a drain or wasteway unless first passed through a lagoon with a settling period of 2 days.



[Rule .04.243 (C)(6), filed 3/1/60.]