WAC 365-210-170
Monthly certification tag report. (Effective July 1, 2003.) Certified manufactured home
installers and manufactured home retailers who purchase
installer certification tags from the department shall submit
a monthly report to the department on a form approved by the
department relative to all installer certification tags
issued.
(1) The report is due no later than the 15th day of each
month following the month of installation work being performed
on a home. A certification tag report is not required for
those months in which no installation work was performed.
(2) A manufactured home retailer who assigns tags to a
certified manufactured home installer is responsible for
ensuring completion of the monthly report. The manufactured
home retailer shall file a separate report for each certified
manufactured home installer to which the manufactured home
retailer assigned installer certification tag(s).
(3) The installer certification tag report shall contain
the following information for each installation:
(a) The installer certification tag number;
(b) The address of the installation;
(c) The date of the installation;
(d) The name and certification number of the certified
manufactured home installer; and
(e) Any other information required by the department.
[Statutory Authority: RCW 43.63B.005, [43.63B.]020,[43.63B.]040
, [43.63B.]060, [43.63B.]035, [43.63B.]090,[43.63B.]800
, 43.330.040. 03-07-035, § 365-210-170, filed
3/13/03, effective 4/13/03.]