WAC 296-863-200   Design, construction, and equipment.  

     Summary:

     Your responsibility:


     To make sure PITs are properly designed, constructed, and equipped.

     You must:

     Design and construction

     Make sure PITs meet design and construction requirements

     WAC 296-863-20005.

     Meet these requirements when modifying or altering PITs

     WAC 296-863-20010.

     Labeling

     Make sure PITs are properly labeled

     WAC 296-863-20015.

     Equipment

     Protect operators from falling objects

     WAC 296-863-20020.

     Provide fall protection on order pickers

     WAC 296-863-20025.

     Provide directional lights when required

     WAC 296-863-20030.

     Liquefied petroleum gas (LPG) PITs

     Make sure liquefied petroleum gas (LPG) fueled PITs meet these requirements

     WAC 296-863-20035.

     Meet these requirements when converting gasoline fuel PITs to liquefied petroleum gas (LPG) fuel

     WAC 296-863-20040.



[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, 49.17.060. 04-19-051, § 296-863-200, filed 9/14/04, effective 2/1/05.]