WAC 296-835-13015   Meet specific requirements if you use a flow coating process.  

     You must:

     (1) Make sure all piping is substantial and rigidly supported.

     (2) Make sure the paint is supplied by a:

     • Gravity tank that does not hold more than ten gallons (38 L)

     OR

     • Direct low-pressure pumping system.

     (3) Have an approved heat-actuated device that shuts down the pumping system if there is a fire.

Note: The area of the sump, and any areas on which paint flows, should be included in the area of dip tank.




[Statutory Authority: RCW 49.17.010, [49.17].040, and[49.17].050 . 02-15-102, § 296-835-13015, filed 7/17/02, effective 10/1/02.]