WAC 296-803-50040   Meet these requirements if it's necessary to temporarily energize a machine, equipment, or component for testing or positioning.  

     You must:

     • Follow your normal energy control procedures to:

     – Remove the lockout or tagout devices.

     – Energize the machine, equipment, or component.

     – Reapply the lockout or tagout devices when testing or positioning is completed.



[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, and 49.17.060. 04-15-105, § 296-803-50040, filed 7/20/04, effective 11/1/04.]