WAC 296-800-31080
Test the employee alarm system. You
must:
• Test the reliability and adequacy of your employee alarm
system every two months.
– Use a different activation device in each test of a
multiactuation device system, so the entire alarm system gets
tested.
• Make sure that supervised (monitored) employee alarm
systems are tested at least once a year for reliability and
adequacy.
[Statutory Authority: RCW 49.17.010, [49.17].040, and[49.17].050
. 01-11-038, § 296-800-31080, filed 5/9/01, effective
9/1/01.]