WAC 296-200A-112
Who is liable when a city, town, or
county fails to verify a contractor's registration? The city,
county, or town that issues a building permit without
verifying the contractor's registration may be liable for a
maximum penalty amount of ten thousand dollars. See RCW 18.27.110(1).
[Statutory Authority: RCW 18.27.040, 18.27.070, 18.27.075,
18.27.125, 2001 c 159, and chapter 18.27 RCW. 03-20-097, §
296-200A-112, filed 9/30/03, effective 11/17/03. Statutory
Authority: Chapter 18.27 RCW. 97-24-071, § 296-200A-112,
filed 12/2/97, effective 1/5/98.]