WAC 296-155-66411
Appendix F -- Selection of protective
systems. The following figures are a graphic summary of the
requirements contained in Part N for excavations 20 feet or
less in depth. Protective systems for use in excavations more
than 20 feet in depth must be designed by a registered
professional engineer in accordance with WAC 296-155-657 (2)
and (3).