WAC 296-150T-0320
What must I provide with my request for
design-plan approval by the department? All requests for
design-plan approval must include:
(1) A completed design-plan approval request form;
(2) One complete set of design plans, specifications,
engineering analysis when required, test procedures and results
plus one additional set for each manufacturing location where the
design plan will be used (see WAC 296-150T-0340 and 296-150T-0350);
(3) If required, at least one set of design plans must have
an original wet stamp from a professional engineer or architect
licensed in Washington state. All new, renewed, and resubmitted
plans, specifications, reports and structural calculations
prepared by or prepared under his or her direct supervision shall
be signed, dated and stamped with their seal. Specifications,
reports, and structural calculations may be stamped only on the
first sheet, provided this first sheet identifies all of the
sheets that follow are included and identified in the same
manner. Plans that have not been prepared by or under the
engineer's or architect's supervision shall be reviewed by them
and they shall prepare a report concerning the plans reviewed.
This report shall:
(a) Identify which drawings have been reviewed by drawing
number and date;
(b) Include a statement that the plans are in compliance
with current Washington state regulations; and
(c) The report shall be stamped and signed by the reviewer.
Any deficiencies shall be corrected on the drawings before
submitting to the department or be included in the report and
identify as to how they are to be corrected. This report shall
be attached to the plan(s) that were reviewed. We will retain
the set with the original wet stamp;
(4) A one-time initial filing fee and the design-plan fee
(see WAC 296-150T-3000); and
(5) A "key drawing" to show the arrangement of modules if
the plan covers three or more modules.
[Statutory Authority: RCW 43.22.480. 99-12-079, §
296-150T-0320, filed 5/28/99, effective 6/28/99.]