| INITIAL FILING FEE | $35.00 | ||
| DESIGN PLAN FEES: | |||
| STRUCTURAL ALTERATION - MASTER DESIGN (CODE CYCLE) | $141.80 | ||
| STRUCTURAL ALTERATION - ONE YEAR DESIGN | $95.00 | ||
| RENEWAL FEE | $42.30 | ||
| RESUBMITTAL FEE | $70.50 | ||
| ADDENDUM (Approval expires on the same date as original plan.) | $70.50 | ||
| ELECTRONIC PLAN SUBMITTAL FEE $5.10 per page for the first set of plans and $0.30 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section. | |||
| DEPARTMENT INSPECTION FEES: | |||
| INSPECTION | |||
| MECHANICAL | |||
| Heat Pump | $34.60 | ||
| Combination Heat Pump (new) and Furnace (replacement) | $46.20 | ||
| Air Conditioning | $34.60 | ||
| Combination Air Conditioning (new) and Furnace (replacement) | $46.20 | ||
| Furnace Installation (gas*** or electric) | $34.60 | ||
| Gas*** Piping | $34.60 | ||
| Wood Stove | $34.60 | ||
| Pellet Stove | $34.60 | ||
| Gas*** Room Heater | $34.60 | ||
| Gas*** Decorative Appliance | $34.60 | ||
| Range: Changing from electric to gas*** | $34.60 | ||
| Gas*** Water Heater Replacement | $23.10 | ||
| Water Heater: Changing from electric to gas*** | $23.10 | ||
| Any combination of Furnace, Range, and Water Heater changing from electric to gas*** and includes Gas Piping charge | $69.20 | ||
| ELECTRICAL | |||
| Heat Pump | $46.20 | ||
| Heat Pump (when home is prewired for a heat pump) | $11.50 | ||
| Combination Heat Pump (new) and Furnace (replacement) | $57.80 | ||
| Air Conditioner | $46.20 | ||
| Air Conditioner (when home is prewired for an air conditioner) | $11.50 | ||
| Combination Air Conditioner (new) and Furnace (replacement) | $57.80 | ||
| Furnace Installation (gas or electric) | $46.20 | ||
| Wood Stove (if applicable) | $46.20 | ||
| Pellet Stove (if applicable) | $46.20 | ||
| Gas*** Room Heater (if applicable) | $46.20 | ||
| Gas*** Decorative Appliance (if applicable) | $46.20 | ||
| Range: Changing from gas*** to electric | $46.20 | ||
| Electric Water Heater Replacement | $46.20 | ||
| Electric Water Heater replacing Gas*** Water Heater | $46.20 | ||
| Each added or modified 120 volt circuit (maximum charge is two circuits) | $46.20 | ||
| Each added 240 volt circuit (for other than Heat Pumps, Air Conditioners, Furnaces, Water Heaters, Ranges, Hot Tubs or Spas) | $46.20 | ||
| Hot Tub or Spa (power from home electrical panel) | $46.20 | ||
| Replace main electrical panel/permanently installed transfer equipment | $46.20 | ||
| Low voltage fire/intrusion alarm | $46.20 | ||
| Fire Safety | $46.20 | ||
| Any combination of Furnace, Range and Water Heater changing from electric to gas*** | $46.20 | ||
| PLUMBING | |||
| Fire sprinkler system (also requires a plan review) | $23.10 | ||
| Each added fixture | $23.10 | ||
| Replacement of water piping system (this includes two inspections) | $104.20 | ||
| STRUCTURAL | |||
| Inspection as part of a mechanical/fire safety installation (cut truss/floor joist, sheet rocking) | $46.20 | ||
| Reroofs (may require a plan review) | $81.00 | ||
| Changes to home when additions bear loads on home per the design of a professional (also requires a plan review) | $81.00 | ||
| Other structural changes (may require a plan review) | $81.00 | ||
| Fire Safety (may also require an electrical fire safety inspection) | $46.20 | ||
| MISCELLANEOUS | |||
| OTHER REQUIRED INSPECTIONS (Per hour*) | $63.60 | ||
| ALL REINSPECTIONS (Per hour*) | $63.60 | ||
| Refund | $11.50 | ||
| INSIGNIA FEES: | |||
| ALTERATION | $11.50 | ||
| FIRE SAFETY CERTIFICATE | $11.50 | ||
| REISSUED - LOST/DAMAGED | $11.50 | ||
| IPIA | |||
| DEPARTMENT AUDIT FEES | |||
| REGULARLY SCHEDULED IPIA AUDIT: | |||
| First inspection on each section (one time only) | $32.00 | ||
| Second and succeeding inspections of unlabeled sections (Per hour*) | $70.50 | ||
| OTHER IPIA FEES: | |||
| Red tag removal during a regularly scheduled IPIA audit (Per hour*separate from other fees) | $70.50 | ||
| Red tag removal at a time other than a regularly scheduled IPIA audit (Per hour* plus travel time* and mileage**) | $70.50 | ||
| Increased frequency surveillance (Per hour* plus travel time* and mileage**) | $70.50 | ||
| Attendance at manufacturers training classes (Per hour* only) | $70.50 | ||
| Subpart "I" investigations (Per hour* plus travel time* and mileage**) | $70.50 | ||
| Alterations to a labeled unit (Per hour* plus travel time* and mileage**) | $70.50 | ||
| IPIA Issues/Responses (Per hour* Plus travel time* and mileage**) | $70.50 | ||
| Monthly surveillance during a regularly scheduled IPIA audit (Per hour*plus travel time* and mileage**) | $70.50 | ||
| Monthly surveillance at a time other than a regularly scheduled IPIA audit (Per hour* plus travel time* and mileage**) | $70.50 | ||
| Plant certifications, recertifications and addenda updates (Per hour* plus travel time* and mileage** per each inspector) | $70.50 | ||
| Response to HBT Audit during a regularly scheduled IPIA audit (Per hour*) | $70.50 | ||
| Response to HBT Audit at a time other than a regularly scheduled IPIA audit (Per hour* plus travel time*and mileage**) | $70.50 | ||
| Alternative construction (AC) letter inspections at placement site (Per hour* plus travel time*and mileage**) | $70.50 | ||
| Replacement of HUD labels (Per hour* plus travel time* and mileage**) | $70.50 | ||
| State Administrative Agency (SAA) inspection fee (Per hour* plus travel time* and mileage**) | $70.50 | ||
| State Administrative Agency (SAA) dispute resolution filing fee | $70.50 | ||
| State Administrative Agency (SAA) dispute resolution (Per hour*) | $70.50 | ||
| OTHER FEES: | |||
| FIELD TECHNICAL SERVICE (Per hour plus travel time* and mileage**) | $65.40 | ||
| PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request) | $12.90 | ||
| VARIANCE INSPECTION FEE | $92.50 | ||
| HOMEOWNER REQUESTED INSPECTION | $92.50 | ||
| DECERTIFICATION OF A MOBILE/MANUFACTURED HOME | $92.50 | ||
| DEMOLITION OF A MOBILE/MANUFACTURED HOME | $92.50 | ||
| ENERGY CONSERVATION PERMIT | $15.80 | ||
| NOTE: Local jurisdictions may have other fees that apply. | |||
| * | Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments. | ||
| ** | Per state guidelines. | ||
| *** | Gas means all gases; natural, propane, etc. | ||