WAC 296-150F-0460
What information must a manufacturer
provide when a professional or firm does the design plan
approval? You must provide the following information with your
approved design plan:
(1) A completed departmental design plan approval request
form;
(2) Two or more sets of the design plans plus elevation
drawings, specifications, engineering analysis, and test results
and procedures necessary for a complete evaluation of the design.
These design plans must have an original wet stamp, be signed,
and dated by the approving professional(s) (see WAC 296-150F-0340
and 296-150F-0350);
(3) A cover sheet on the design plan noting which
professional approved each portion of the design plan;
(4) A copy of the authorization letter from us;
(5) The design plan fee for design plans approved by
professionals or firms (see WAC 296-150F-3000);
(6) A professional who designs and certifies that the
factory-built home or commercial structure design meets state
requirements cannot also approve the design plan in the plan
approval process;
(7) A professional cannot approve those electrical designs
listed in WAC 296-150F-0310(2); and
(8) A professional cannot approve plans submitted under a
reciprocal agreement.
[Statutory Authority: Chapter 43.22 RCW. 98-14-078, §
296-150F-0460, filed 6/30/98, effective 7/31/98. Statutory
Authority: RCW 43.22.340, [43.22.]355, [43.22.]360, [43.22.]432,[43.22.]440
and [43.22.]480. 96-21-146, § 296-150F-0460, filed
10/23/96, effective 11/25/96.]