WAC 296-150C-0240   What documentation do you need to perform an alteration inspection?  (1) If you alter a commercial coach, we must inspect the alteration.

     (2) Before we perform an alteration inspection and attach an alteration insignia, you must send us:

     (a) A description of the proposed alteration;

     (b) Applicable specifications, engineering analysis, test procedures and results for design-plan review;

     (c) The plan review fee (if you want us to approve your design plan);

     (d) The inspection fee; and

     (e) The insignia application and fee. (See WAC 296-150C-3000.)

     (3) A design plan review is not required if the alteration can be made without altering any of the existing structure.



[Statutory Authority: RCW 43.22.340, [43.22.]355, [43.22.]360, [43.22.]432, [43.22.]440 and [43.22.]480. 96-21-146, § 296-150C-0240, filed 10/23/96, effective 11/25/96.]