WAC 296-150C-0230
What are the insignia application
requirements? (1) If you are requesting insignia for
commercial coaches that you intend to manufacture under a new
design plan, your completed application must include:
(a) A completed design-plan approval request form;
(b) One complete set of design plans, specifications,
engineering analysis, and test procedures and results, plus
one additional set for each manufacturing location where the
design plan will be used.
(c) At least one set of design plans must have an
original wet stamp from a professional engineer or architect
licensed in Washington state. We will retain the set with the
original wet stamp; and
(d) A one-time initial filing fee, the design-plan fee
(if you want us to approve your design plan), and the fee for
each insignia. (See WAC 296-150C-3000.)
(2) If you are requesting insignia under an approved
design plan, your completed application must include:
(a) A completed insignia application form; and
(b) The fee for each commercial coach insignia (see WAC 296-150C-3000).
[Statutory Authority: RCW 43.22.340, [43.22.]355,[43.22.]360
, [43.22.]432, [43.22.]440 and [43.22.]480. 96-21-146, § 296-150C-0230, filed 10/23/96, effective
11/25/96.]