WAC 296-104-155
Inspection -- What preparations are
necessary prior to internal inspections? The owner or user
has the responsibility to prepare a pressure-retaining item
for internal inspection. Requirements of occupational safety
and health regulations (federal, state, local, or other), as
well as the owner or user's own safety program and the safety
program of the inspector's employer are applicable. In the
absence of such rules, prudent and generally accepted
engineering safety procedures satisfactory to the inspector
shall be employed by the owner or user.
The owner or user shall prepare a boiler for internal
inspection in the following manner or as required by the
inspector:
(1) Water shall be drawn off and the boiler thoroughly
washed (when a boiler is being prepared for internal
inspection, the water should not be withdrawn until it has
been sufficiently cooled).
(2) All manhole and handhole plates and wash-out plugs
and water column connections shall be removed, the furnace and
combustion chambers thoroughly cooled and cleaned.
(3) All grates of internally fired boilers shall be
removed.
(4) At each annual inspection brickwork shall be removed
as required by the inspector in order to determine the
condition of the boiler headers, drums, furnace, supports, or
other parts.
(5) The steam gauge shall be removed for testing or
evidence of testing shown.
(6) Any leakage of steam or water into the boiler shall
be prevented by either disconnecting the pipe or block valve
at the most convenient point or installing isolation blinds.
The owner or user must ensure that an effective energy
isolation program (lock out and/or tag out) is in place and in
effect that will prevent the unexpected energizing, start up,
or release of stored energy.
The inspector shall determine that a safe atmosphere
exists before entering the boiler or pressure-retaining item.
(7) The low water cutout shall be disassembled to such a
degree as the inspector shall require.
(8) Pressure relief devices shall be removed and tested
if required by the inspector.
Unfired pressure vessels shall be prepared for internal
inspection to the extent deemed necessary by the inspector.
[Statutory Authority: RCW 70.79.030, 70.79.040, 70.79.150,
70.79.290, 70.79.330, and 70.79.350. 08-12-015, §
296-104-155, filed 5/27/08, effective 6/30/08. Statutory
Authority: RCW 70.79.030, 70.79.040, 70.79.150, 70.79.290,
70.79.330, 70.79.350, and chapter 70.79 RCW. 02-23-036, §
296-104-155, filed 11/13/02, effective 12/14/02. Statutory
Authority: RCW 70.79.030 and 70.79.040. 99-22-026, §
296-104-155, filed 10/26/99, effective 11/26/99; 95-19-058, §
296-104-155, filed 9/15/95, effective 10/16/95; Part III, §
12, filed 3/23/60.]