WAC 296-104-125
Inspection -- What are the requirements
for obtaining a certificate of inspection? Before a
certificate of inspection as defined in RCW 70.79.290 is
issued, a boiler or unfired pressure vessel must be inspected
by an inspector and have all necessary permits. In addition,
the owner or user shall pay the fees scheduled in WAC 296-104-700 directly to the chief inspector. The inspection
process is not complete until the certificate of inspection is
posted.
If the owner or user of each boiler or unfired pressure
vessel required to be inspected refuses to allow an inspection
to be made, or refuses to pay the above fee, the certificate
of inspection shall be suspended by the chief inspector until
the owner or user complies with the requirements.
[Statutory Authority: RCW 70.79.030, 70.79.040, 70.79.150,
70.79.290, 70.79.330, 70.79.350, and chapter 70.79 RCW. 02-23-036, § 296-104-125, filed 11/13/02, effective 12/14/02. Statutory Authority: RCW 70.79.030 and 70.79.040. 99-22-026,
§ 296-104-125, filed 10/26/99, effective 11/26/99; Part III, §
6, filed 3/23/60.]