WAC 296-96-02420
What are the requirements for temporary
construction operating permits? (1) A thirty-day temporary
construction operating permit is for transportation of
construction personnel and materials only, not for the
transportation by the general public.
(2) Temporary construction operating permits are valid
for thirty days.
(3) You must contact the department for a reinspection to
renew the permit.
(4) All elevators with expired temporary construction
operating permits that have not passed a final inspection may
not be operated. Operating an elevator with an expired permit
shall result in a civil penalty (see WAC 296-96-01070 (1)(a)).
(5) Renewal of a temporary operating permit is at the
discretion of the department.
[Statutory Authority: Chapter 70.87 RCW. 07-24-041, §
296-96-02420, filed 11/30/07, effective 1/1/08.]