WAC 296-96-01000   What is the permit process for conveyances?  (1) Prior to construction, alteration, or relocation of any conveyance, the licensed elevator contractor shall:

     (a) Submit an installation application to the department. See WAC 296-96-01010 through 296-96-01025.

     (b) Plans must be submitted to and approved by the department. See WAC 296-96-01030.


EXCEPTION:
Most alterations will not require plans.

     (c) Post an approved permit from the department on the job site.

     (d) Obtain and pass an inspection prior to placing the conveyance in service. See WAC 296-96-01035.

     (2) The owner must obtain and renew an annual operating certificate for each conveyance that they own, except for residential conveyances. See WAC 296-96-01065.

     (3) After initial purchase and inspection, private residence conveyance(s) do not require an annual operating certificate. However, annual inspections may be conducted upon request. See WAC 296-96-01045 for the permit process.



[Statutory Authority: Chapter 70.87 RCW. 07-24-041, § 296-96-01000, filed 11/30/07, effective 1/1/08. Statutory Authority: RCW 70.87.020, 70.87.030, 70.87.034, 70.87.120, 70.87.185, 70.87.190, 2002 c 98, 2003 c 143 and 2004 c 66. 04-12-047, § 296-96-01000, filed 5/28/04, effective 6/30/04. Statutory Authority: RCW 70.87.020, 70.87.030, 70.87.034, 70.87.120, 70.87.185 and chapter 70.87 RCW. 01-02-026, § 296-96-01000, filed 12/22/00, effective 1/22/01.]