WAC 296-52-60100
Daylight blasting.
Blasting operations must be conducted during daylight hours whenever possible.
[Statutory Authority: RCW
49.17.010
,
[49.17].040
, and
[49.17].050
. 02-03-125, § 296-52-60100, filed 1/23/02, effective 3/1/02.]