WAC 296-46B-907
Provisional permits.
Provisional electrical work permit - use/duration/refunds.
(1) Only licensed electrical or telecommunications
contractors can use provisional electrical work permits.
(2) If a provisional electrical work permit label is
used, the following requirements must be met:
(a) Prior to beginning the work, the certified
electrician or telecommunications worker performing the
installation must affix the provisional electrical work permit
label on the cover of the panelboard, overcurrent device, or
telecommunications equipment supplying the circuit or
equipment.
(b) The job site portion of the label must include the
following:
(i) Date the work is begun;
(ii) Contractor's name;
(iii) Contractor's license number; and
(iv) Short description of the work.
(c) The contractor portion of the label must include the
following:
(i) Date the work is begun;
(ii) Contractor's license number;
(iii) Job site address;
(iv) Owner's name; and
(v) Short description of the work.
(d) The label must be filled in using sunlight and
weather resistant ink.
(e) The contractor must return the contractor's portion
of the label to the department of labor and industries,
electrical section office having jurisdiction for the
inspection, within two working days after the job site portion
of the label is affixed. Either receipt by department of
labor and industries or postmark to a valid department of
labor and industries electrical address is acceptable for
meeting this requirement.
(f) The contractor must return the contractor's portion
of the label to the department of labor and industries, chief
electrical inspector, within five working days after
destroying or voiding any label.
(g) The contractor is responsible for safekeeping of all
purchased labels.
(3) Refunds are not available for provisional electrical
work permit labels.
(4) Provisional electrical work permit labels will be
sold in blocks of twenty.
(5) Any contractor purchasing a provisional electrical
work permit label may be audited for compliance with the
provisions for purchasing, inspection, reporting of
installations, and any other requirement of usage.
(6) An electrical work permit must be obtained within two
working days after posting the provisional work permit label.
See WAC 296-46B-907 (2)(e).
[Statutory Authority: RCW 19.28.006, 19.28.010, 19.28.031,
19.28.041, 19.28.061, 19.28.101, 19.28.131, 19.28.161,
19.28.171, 19.28.191, 19.28.201, 19.28.211, 19.28.241,
19.28.251, 19.28.281, 19.28.311, 19.28.321, 19.28.400,
19.28.420, 19.28.490, 19.28.551. 09-20-032, § 296-46B-907,
filed 9/29/09, effective 10/31/09; 08-24-048, § 296-46B-907,
filed 11/25/08, effective 12/31/08.]