WAC 296-45-385   Overhead lines.  This section provides additional requirements for work performed on or near overhead lines and equipment.

     (1) General.

     (a) Before elevated structures and adjacent structures, such as poles or towers of the adjacent supporting poles, structures, and conductor supporting hardware, are subjected to such stresses as climbing or the installation or removal of equipment may impose, the employer shall ascertain that the structures are capable of sustaining the additional or unbalanced stresses. If the pole or other structure cannot withstand the loads which will be imposed, it shall be braced or otherwise supported so as to prevent failure.

Note: Appendix C contains test methods that can be used in ascertaining whether a wood pole is capable of sustaining the forces that would be imposed by an employee climbing the pole. This paragraph also requires the employer to ascertain that the pole can sustain all other forces that will be imposed by the work to be performed.

     (b) When poles are set, moved, or removed near exposed energized overhead conductors, the pole may not contact the conductors.

     (c) When a pole is set, moved, or removed near an exposed energized overhead conductor, the employer shall ensure that each employee wears electrical protective equipment or uses insulated devices when handling the pole and that no employee contacts the pole with uninsulated parts of his or her body.

     (d) To protect employees from falling into holes into which poles are to be placed, the holes shall be attended by employees or physically guarded whenever anyone is working nearby.

     (2) Installing and removing overhead lines. The following provisions apply to the installation and removal of overhead conductors or cable.

     (a) The employer shall use the tension stringing method, barriers, or other equivalent measures to minimize the possibility that conductors and cables being installed or removed will contact energized power lines or equipment.

     (b) When conductors are being strung in or removed, they shall be kept under positive control to prevent accidental contact with energized circuit.

     (c) The protective measures required by WAC 296-45-375 (10)(c) for mechanical equipment shall also be provided for conductors, cables, and pulling and tensioning equipment when the conductor or cable is being installed or removed close enough to energized conductors that any of the following failures could energize the pulling or tensioning equipment or the wire or cable being installed or removed:

     (i) Failure of the pulling or tensioning equipment;

     (ii) Failure of the wire or cable being pulled; or

     (iii) Failure of the previously installed lines or equipment.

     (d) When conductors being installed or removed cross over energized conductors in excess of 600 volts, rope nets or guard structures must be installed unless provision is made to isolate or insulate the worker or the energized conductor. Where the design of the circuit-interrupting devices protecting the lines so permits, the automatic-reclosing feature of these devices must be made inoperative. In addition, the line being strung must be grounded on either side of the crossover or considered and worked as energized.

     (e) Before lines are installed parallel to existing energized lines, the employer shall make a determination of the approximate voltage to be induced in the new lines, or work shall proceed on the assumption that the induced voltage is hazardous. Unless the employer can demonstrate that the lines being installed are not subject to the induction of a hazardous voltage or unless the lines are treated as energized, the following requirements also apply:

     (i) Each bare conductor shall be grounded in increments so that no point along the conductor is more than 2 miles (3.22 km) from a ground.

     (ii) The grounds required in subsection (2)(e)(i) of this section shall be left in place until the conductor installation is completed between dead ends.

     (iii) The grounds required in subsection (2)(e)(i) of this section shall be removed as the last phase of aerial cleanup.

     (iv) If employees are working on bare conductors, grounds shall also be installed at each location where these employees are working, and grounds shall be installed at all open dead-end or catch-off points or the next adjacent structure.

     (v) If two bare conductors are to be spliced, the conductors shall be bonded and grounded before being spliced.

     (f) Reel handling equipment, including pulling and tensioning devices, shall be in safe operating condition and shall be leveled and aligned.

     (g) Load ratings of stringing lines, pulling lines, conductor grips, load-bearing hardware and accessories, rigging, and hoists may not be exceeded.

     (h) Each pull must be snubbed or dead ended at both ends before subsequent pulls.

     (3) Pulling lines and accessories shall be inspected prior to each use and replaced or repaired when damaged or when there is a reasonable basis to doubt the dependability of such lines or accessories.

     (4) Conductor grips may not be used on wire rope, unless the grip is specifically designed for this application.

     (5) Reliable communications, through two-way radios or other equivalent means, shall be maintained between the reel tender and the pulling rig operator.

     (6) The pulling rig may only be operated when it is safe to do so.

Note: Examples of unsafe conditions include employees in locations prohibited by subsection (7) of this section, conductor and pulling line hang-ups, and slipping of the conductor grip.

     (7) While the conductor or pulling line is being pulled (in motion) with a power-driven device, employees are not permitted directly under overhead operations or on the cross arm, except as necessary to guide the stringing sock or board over or through the stringing sheave.

     (8) Live-line bare-hand work is prohibited.

     (9) When winches, trucks, or tractors are being used to raise poles, materials, to pull in wires, to pull slack or in any other operation, there shall be an operator at the controls unless the machinery or process is stopped.

     (10) Leadworkers shall designate an employee to give signals when required.

     (11) Raising poles, towers or fixtures in the close proximity of high voltage conductors shall be done under the supervision of a qualified employee.

     (12) Employees shall not crawl over insulator strings but shall use a platform or other approved device to work from when making dead ends or doing other work beyond strings of insulators, at such distance that they cannot reach the work from the pole or fixture. While working on the platform or other device, they shall be secured with safety straps or a rope to prevent falling. The provision of this subsection does not apply to extra high voltage bundle conductors when the use of such equipment may produce additional hazard. Climbing over dead end assemblies is permissible only after they have been completed and pinned in the final position.

     (13) Towers and structures. The following requirements apply to work performed on towers or other structures which support overhead lines.

     (a) The employer shall ensure that no employee is under a tower or structure while work is in progress, except where the employer can demonstrate that such a working position is necessary to assist employees working above.

     (b) Tag lines or other similar devices shall be used to maintain control of tower sections being raised or positioned, unless the employer can demonstrate that the use of such devices would create a greater hazard.

     (c) The loadline may not be detached from a member or section until the load is safely secured.

     (d) No one must be permitted to remain in the footing while equipment is being spotted for placement.

     (e) A designated employee must be utilized to determine that required clearance is maintained in moving equipment under or near energized lines.

     (14) All conductors, subconductors, and overhead ground conductors must be bonded to the tower at any isolated tower where it may be necessary to complete work on the transmission line.

     (15) A transmission clipping crew shall have a minimum of two structures clipped in between the crew and the conductor being sagged.

     (16) While on patrol at night and operating a motor vehicle on public highways, there shall be two employees, at least one of whom shall be a journey level lineworker or otherwise qualified employee. If repair to line or equipment is found to be of such nature as to require two lineworkers, work shall not proceed until additional help has been obtained provided that in cases of emergency where delay would increase the danger to life, limb, or substantial property, one employee may clear the hazard without assistance.

     (17) Except during emergency restoration procedures, work shall be discontinued when adverse weather conditions would make the work hazardous in spite of the work practices required by this section.

Note: Thunderstorms in the immediate vicinity, high winds, snow storms, and ice storms are examples of adverse weather conditions that are presumed to make this work too hazardous to perform, except under emergency conditions.




[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, 49.17.060. 05-17-038, § 296-45-385, filed 8/9/05, effective 10/1/05; 98-07-009, § 296-45-385, filed 3/6/98, effective 5/6/98.]