WAC 296-45-17540
Release from lockout/tagout. Before
lockout or tagout devices are removed and energy is restored to
the machine or equipment, procedures shall be followed and
actions taken by the authorized employees to ensure the
following:
(1) The work area shall be inspected to ensure that
nonessential items have been removed and that machine or
equipment components are operationally intact.
(2) The work area shall be checked to ensure that all
employees have been safely positioned or removed.
(3) After lockout or tagout devices have been removed and
before a machine or equipment is started, affected employees
shall be notified that the lockout or tagout devices have been
removed.
(4) Each lockout or tagout device shall be removed from each
energy isolating device by the authorized employee who applied
the lockout or tagout device. However, if that employee is not
available to remove it, the device may be removed under the
direction of the employer, provided that specific procedures and
training for such removal have been developed, documented, and
incorporated into the employer's energy control program. The
employer shall demonstrate that the specific procedure provides a
degree of safety equivalent to that provided by the removal of
the device by the authorized employee who applied it. The
specific procedure shall include at least the following elements:
(a) Verification by the employer that the authorized
employee who applied the device is not at the facility;
(b) Making all reasonable efforts to contact the authorized
employee to inform him or her that his or her lockout or tagout
device has been removed; and
(c) Ensuring that the authorized employee has this knowledge
before he or she resumes work at that facility.
[Statutory Authority: RCW 49.17.010, [49.17].040, [49.17].050
and [49.17].060. 98-07-009, § 296-45-17540, filed 3/6/98,
effective 5/6/98.]