| Note: | When it can be determined from the design of the circuit and the overcurrent devices involved that the automatic operation of a device was caused by an overload rather than a fault condition, no examination of the circuit or connected equipment is needed before the circuit is reenergized. |
| Note: | Electrical installation requirements for locations where flammable materials are present on a regular basis are contained in WAC 296-24-95613. |