WAC 296-17A-0701
Classification 0701.
0701-00 New dam construction: All operations in dam site area
Applies to contractors engaged in the construction of new
dams only, and includes all operations in the dam site area. A dam is a barrier built across a waterway to control the flow
or level of water. Work contemplated by this classification
includes the construction of the foundation and substructure
such as, but not limited to, earth and rock excavation; boring
or tunneling; pile driving or shaft sinking; caisson work;
erection of cofferdams; placement of reinforcing steel and
rebar; setting and stripping of forms, false work (temporary
forms and support structures), concrete distributing
apparatus; erection of scaffolds; pouring and finishing
concrete; and the placement of gates, turbines, control towers
and electrical wiring apparatus. This classification also
includes the incidental construction of fish ladders as part
of the new dam construction project.
This classification excludes all other construction,
service, or repair work done as part of an existing dam which
is to be reported separately in the classification applicable
to the phase of construction work being performed. For
example, the inspection of the foundation by divers is to be
reported separately in classification 0202; the patching of
cracks in the dam is to be reported separately in
classification 0518.
[07-01-014, recodified as § 296-17A-0701, filed 12/8/06,
effective 12/8/06. Statutory Authority: RCW 51.16.035. 98-18-042, § 296-17-528, filed 8/28/98, effective 10/1/98;
96-12-039, § 296-17-528, filed 5/31/96, effective 7/1/96. Statutory Authority: RCW 51.04.020(1) and 51.16.035. 94-12-063, § 296-17-528, filed 5/30/94, effective 6/30/94. Statutory Authority: RCW 51.16.035. 85-24-032 (Order 85-33),
§ 296-17-528, filed 11/27/85, effective 1/1/86; Order 76-36, §
296-17-528, filed 11/30/76; Order 73-22, § 296-17-528, filed
11/9/73, effective 1/1/74.]