WAC 296-14-6238
Who receives payment from the
department? The department will pay the contractor directly
and/or reimburse the worker for any payment already made to
the contractor for approved and completed residence
modifications. In order to determine that modifications have
been satisfactorily completed, the department will require the
following documents to be submitted before releasing final
payment:
(1) A signed letter of satisfaction from the worker; and
(2) A positive report of a final inspection from the
appropriate inspection authorities, if required; and
(3) A report of an inspection from the residence
modification consultant if requested by the department; and
(4) A release of lien form signed by the contractors or
subcontractors or both.
[Statutory Authority: RCW 51.04.010, 51.04.020, 51.32.240,
and 2005 c 411. 06-06-065, § 296-14-6238, filed 2/28/06,
effective 4/1/06.]