WAC 246-359-070
Application and construction documents
required for plan review. (1) To have construction documents
reviewed the applicant must submit to the department:
(a) A completed and signed application, on a form provided
by the department, for each structure (individual building);
(b) The required plan review fee, according to WAC 246-359-990;
(c) Two sets of construction documents, on substantial
paper, including:
(i) Plans and diagrams drawn to scale;
(ii) Specifications;
(iii) Computations; and
(iv) Other documents needed to determine if the provisions
of this chapter and related state rules are being met, for
example solid waste disposal management plan or soil testing;
(d) When applicable, manufacturer's installation
instructions as required for factory assembled structures, WAC 246-359-710, and manufactured homes, WAC 246-359-720;
(e) Proof of an adequate approved potable water supply to
meet the intended use of the temporary worker housing and which
meets the requirements of chapters 246-290 and 246-291 WAC (water
rules) and WISHA;
(f) Copy of the on-site sewage system permit from the
jurisdiction having authority;
(g) Proof of a water right permit from the department of
ecology, when required;
(h) Proof of current approval from labor and industries,
when required, for factory assembled structures; and
(i) Proof the project meets zoning requirements as
established for height, setback and road access under the
authority having jurisdiction.
(2) The plans and specifications must clearly identify in
detail the location, nature and extent of the work proposed.
(3) The department will only begin plan review when:
(a) All the documents required in this section are
submitted; and
(b) The plan review fee is received.
(4) The department can refund up to eighty percent of the
plan review fee if the applicant submits a written request to
stop the project before the plan review process is complete.
Refunds are based on the plan review fee paid as required by
Table I in WAC 246-359-990 and the amount of plan review
completed as determined by the department.
(5) The department will charge an additional plan review fee
according to Table I in WAC 246-359-990, when:
(a) Site inspections determine the project has not been
built according to the approved construction documents and an
additional plan review is required; or
(b) Revised construction documents are submitted after
approval of the initial construction documents.
[Statutory Authority: RCW 70.114A.081. 99-03-065, §
246-359-070, filed 1/18/99, effective 2/18/99.]