WAC 246-337-040
Review of construction documents and
functional program. (1) Prior to beginning any construction
or remodeling, the applicant or licensee must submit an
application and fee, if applicable, to the department and
receive written authorization by the department to proceed.
(2) The licensee or applicant must submit a written
functional program, in accordance with RCW 71.12.470,
outlining the service categories and types of residents to be
served and how the needs of the residents will be met
including, but not limited to:
(a) Program goals;
(b) Staffing and health care to be provided;
(c) Infection control;
(d) Security and safety;
(e) Seclusion and restraint;
(f) Laundry;
(g) Food and nutrition; and
(h) Medication.
(3) The licensee or applicant must submit accurate,
timely, and complete construction documents that comply with
all governing rules.
(4) Construction documents must include:
(a) Drawings prepared, stamped, and signed by an
architect licensed by the state of Washington under chapter 18.08 RCW. The services of a consulting engineer licensed by
the state of Washington may be used for the various branches
of the work, if appropriate; and
(b) Drawings with coordinated architectural, mechanical,
and electrical work drawn to scale showing complete details
for construction, including:
(i) Site plan(s) showing streets, driveways, parking,
vehicle and pedestrian circulation, utility line locations,
and location of existing and new buildings;
(ii) Dimensioned floor plan(s) with the function of each
room and fixed/required equipment designated;
(iii) Elevations, sections, and construction details;
(iv) Schedule of floor, wall, and ceiling finishes;
(v) Schedules of doors and windows - sizes and type, and
door finish hardware;
(vi) Mechanical systems - plumbing and
heating/venting/air conditioning; and
(vii) Electrical systems, including lighting, power, and
communication/notification systems;
(c) Specifications that describe with specificity the
workmanship and finishes; and
(d) Shop drawings and related equipment specifications
for:
(i) An automatic fire sprinkler system when required by
other codes; and
(ii) An automatic fire alarm system when required by
other codes.
(5) A license may not be issued for a new RTF, a new
facility within an RTF, or changes in resident bed capacity or
licensed service category(ies) for a currently licensed RTF,
without written approval from the department's construction
review services unit and residential care services program.
(6) The applicant or licensee must:
(a) Comply with the standards as adopted by the
Washington state building code council;
(b) Assure conformance to the approved plans during
construction;
(c) Submit addenda, change orders, construction change
directives or any other deviation from the approved plans
prior to their installation;
(d) Provide a written construction project completion
notice to the department indicating:
(i) The completion date; and
(ii) The actual construction cost;
(e) Make adequate provisions for the health, safety, and
comfort of residents during construction projects.
[Statutory Authority: Chapter 71.12 RCW. 05-15-157, §
246-337-040, filed 7/20/05, effective 8/20/05.]