WAC 246-324-250
Construction. (1) The applicant or
licensee shall comply with chapter 31 of the Washington State
Building Code for all construction.
(2) Prior to starting construction, the applicant or
licensee shall submit the following documentation to the
department:
(a) A completed application form, a copy of which is
provided in the Submissions Guide for Health and Residential
Facility Construction Projects, which may be obtained from the
department;
(b) The fee specified in chapter 246-314 WAC;
(c) A functional program which describes the services and
operational methods affecting the hospital building, premises,
and patients;
(d) One set of preliminary documents including, when
applicable:
(i) Plot plans drawn to scale showing:
(A) Streets, driveways, parking, vehicle and pedestrian
circulation;
(B) Site utilities, water service system, sewage disposal
system, electrical service system, elevations; and
(C) Location of existing and new buildings and other
fixed equipment;
(ii) Building plans drawn to scale showing:
(A) Floor plans designating function of each room and
fixed equipment;
(B) Typical building sections and exterior elevations;
(iii) Outline specifications generally describing the
construction and materials including mechanical and electrical
systems; and
(e) Three sets of final construction drawings, stamped by
a Washington state licensed architect or engineer, complying
with the requirements of this chapter including, when
applicable:
(i) Plot plans drawn to scale showing all items required
in the preliminary plan in final form;
(ii) Building plans drawn to scale showing:
(A) Floor plans designating function of each room and
fixed equipment;
(B) Interior and exterior elevations;
(C) Building sections and construction details;
(D) Schedules of room finishes, doors, finish hardware
and windows;
(E) Mechanical, including plumbing, heating, venting and
air conditioning; and
(F) Electrical, including lighting, power and
communication systems; and
(iii) Specifications fully describing the workmanship and
finishes;
(f) One copy of specifications and the radiant panel test
report for each carpet type used in corridors and exitways;
(g) Three copies of fire sprinkler system shop drawings,
hydraulic calculations and equipment specifications, stamped
by the fire sprinkler contractor; and
(h) Three copies of fire alarm system shop drawings and
equipment specifications.
(3) The licensee shall:
(a) Obtain department approval of final construction
documents prior to starting construction;
(b) Conform with the approved plans during construction;
(c) Consult with the department prior to deviating from
approved documents;
(d) Provide a written construction project completion
notice to the department indicating:
(i) The expected completion date; and
(ii) Compliance with the approved construction documents,
requirements of chapter 18.20 RCW and this chapter;
(e) Make adequate provisions for the health, safety, and
comfort of patients during construction projects;
(f) Obtain authorization from the department prior to
occupying or using new construction; and
(g) Obtain approval of the Washington state fire
protection services division prior to construction,
modification, and alteration consistent with RCW 18.20.130.
[Statutory Authority: Chapter 71.12 RCW and RCW 43.60.040. 95-22-013, § 246-324-250, filed 10/20/95, effective 11/20/95.]