WAC 246-310-570
Circumstances for which an amended
certificate of need is required. (1) An amended certificate of
need shall be required for any of the following modifications of
a project for which a certificate of need was issued and has been
submitted in accordance with subsection (2) of this section:
(a) An addition of a new service;
(b) An expansion of a service beyond that which was included
in the certificate of need application on which the issuance of
the certificate of need was based;
(c) An increase in the inpatient bed capacity;
(d) The modification or release of a condition placed on a
certificate of need;
(e) A significant reduction in the scope of a project for
which a certificate of need has been issued without a
commensurate reduction in the cost of the project, or the project
cost increases (as represented in bids on a construction project
or final cost estimate or estimates acceptable to the person to
whom the certificate of need was issued) when the total of such
increases exceeds twelve percent or fifty thousand dollars,
whichever is greater, over the maximum capital expenditure
specified by the secretary's designee in issuing the certificate
of need: Provided however, That the review of such reductions or
cost increases shall be restricted to the continued conformance
of the project with the criteria contained in WAC 246-310-220 and 246-310-240; or
(f) A change in the approved site.
(2) An application to amend a certificate of need shall be
submitted and the certificate of need will be issued or denied
prior to project completion except for projects involving
construction. For projects involving construction, an amendment
application may be submitted up to ninety days after project
completion provided the applicant meets the following eligibility
requirements:
(a) Eligibility requirements for a ninety-day extension to
submit an application to amend a certificate of need.
(i) The applicant has submitted quarterly reports and
updated the capital expenditures as required in WAC 246-310-590;
(ii) The quarterly progress reports identified that the
actual construction costs had exceeded twelve percent or fifty
thousand dollars (whichever is greater) of the approved capital
expenditure; and
(iii) The department did not notify the applicant in writing
that an amended certificate of need was needed.
(b) In the event the applicant has submitted quarterly
progress reports as identified in (a)(i) of this subsection and
the reports did not reflect that the actual construction costs
had exceeded the approved capital expenditure, the applicant
would only be eligible for a ninety-day extension if the
applicant can document:
(i) All costs in excess of twelve percent or fifty thousand
dollars (whichever is greater) of the approved capital
expenditure were totally unforeseen as documented by a signed
affidavit from the contractor; and
(ii) That all the excess costs were incurred after the
submission of the last quarterly progress report preceding the
projects' completion.
(3) An application for an amended certificate of need shall
be submitted in accordance with the provisions of WAC 246-310-090.
(4) An application for an amended certificate of need may be
reviewed under the expedited review process set forth in WAC 246-310-150.
(5) The department shall provide a written determination as
to the requirement for an amended certificate of need within
twenty-one days after receipt of a request for such
determination.
[Statutory Authority: Chapter 70.38 RCW. 96-24-052, §
246-310-570, filed 11/27/96, effective 12/28/96. Statutory
Authority: RCW 70.38.135 and 70.38.919. 92-02-018 (Order 224),
§ 246-310-570, filed 12/23/91, effective 1/23/92. Statutory
Authority: RCW 43.70.040. 91-02-049 (Order 121), recodified as
§ 246-310-570, filed 12/27/90, effective 1/31/91. Statutory
Authority: RCW 70.38.135. 86-06-030 (Order 2344), § 248-19-450,
filed 2/28/86; 81-09-012 (Order 210), § 248-19-450, filed 4/9/81,
effective 5/20/81. Statutory Authority: Chapter 70.38 RCW. 79-12-079 (Order 188), § 248-19-450, filed 11/30/79.]