WAC 246-296-140
Final project selection criteria. When
awarding a DWSRF loan to a public water system, the board
shall consider, at a minimum, the
applicant's ability to:
(1) Repay the DWSRF loan based on a risk
assessment;
(2) Provide adequate security in case of
DWSRF loan default; and
(3) Promptly begin the project based
on past contract performance, if applicable.
[Statutory Authority: RCW 70.119A.170 and Federal Safe
Drinking Water Act, H.R. 1452. 12-01-077, § 246-296-140,
filed 12/19/11, effective 2/1/12. Statutory Authority: RCW 70.119A.170. 01-21-137, § 246-296-140, filed 10/24/01,
effective 11/24/01.]