WAC 246-290-108
Consistency with local plans and
regulations. Consistency with local plans and regulations
applies to planning and engineering documents under WAC 246-290-106, 246-290-107, and 246-290-110.
(1) Municipal water suppliers must include a consistency
review and supporting documentation in its planning or
engineering document describing how it has considered
consistency with local plans and regulations. This review
must include elements of local plans and regulations, as they
reasonably relate to water service to be provided by a
municipal water supplier for any new connection, including:
(a) Land use and zoning within the applicable service
area;
(b) Six-year growth projections used in the demand
forecast;
(c) Utility service extension ordinances of a city or
town when water service is provided by the water utility of
the city or town;
(d) Provisions of water service for new service
connections; and
(e) Other relevant elements related to water supply
planning as determined by the department.
(2) Municipal water suppliers must request each local
government with jurisdiction over the applicable service area
to provide a consistency review.
(a) Municipal water suppliers shall provide each local
government with jurisdiction sixty days to review the planning
or engineering document unless another state statute or state
regulation requires a different time frame. The municipal
water supplier must provide the local government with
jurisdiction an additional thirty days for review if
requested.
(b) If an inconsistency is documented by the local
government with jurisdiction within the time frame outlined in
(a) of this subsection, the municipal water supplier must
provide the inconsistency information to the department.
(c) If the local government with jurisdiction documents
in writing an inconsistency exists with local plans and
regulations, the municipal water supplier shall address the
inconsistency. The local government with jurisdiction shall
be provided sixty days to review any revisions or responses
that address the inconsistency.
(3) If the local government with jurisdiction does not
provide a consistency review, the municipal water supplier
shall complete the consistency review as described in
subsection (1) of this section. The municipal water supplier
must also document:
(a) The amount of time provided to each local government
with jurisdiction to review the planning and engineering
documents as defined in subsection (2) of this section; and
(b) The efforts taken to request a consistency review
from the local government with jurisdiction.
[Statutory Authority: RCW 70.119A.180 and 43.20.050. 08-03-061, § 246-290-108, filed 1/14/08, effective 2/14/08.]