WAC 246-282-070
Construction and maintenance. (1) All
owners and persons in charge of shellfish operations must arrange
their physical facilities to aid in the flow of shellfish
products through all handling, processing, and storage areas in a
manner that will minimize contamination of the shellfish.
(2) Any owner of a shellfish operation must submit to the
department for consultation properly prepared plans and
specifications of physical facilities for shellfish processing or
sanitation activities at least thirty days before the facilities
are:
(a) Originally constructed;
(b) Converted from another use; or
(c) Extensively remodeled to the extent that a plan for a
building permit is required by the city or county where located.
(3) The department will review properly prepared plans and
specifications of physical facilities for shellfish processing or
sanitation activities required by subsection (2) of this section
within thirty days of receipt and provide technical assistance to
the owner of the shellfish operation regarding whether the
proposed physical facilities would meet the requirements of this
chapter.
[Statutory Authority: RCW 69.30.030 and 43.20.030. 01-04-054, §
246-282-070, filed 2/5/01, effective 3/8/01. Statutory
Authority: RCW 43.20.050. 91-02-051 (Order 124B), recodified as
§ 246-282-070, filed 12/27/90, effective 1/31/91. Statutory
Authority: RCW 69.30.030. 78-08-059 (Order 163), § 248-58-060,
filed 7/24/78; Regulation 58.060, effective 3/11/60.]