WAC 246-272A-0260
Inspection. (1) For all activities
requiring a permit, the local health officer shall:
(a) Visit the OSS site during the site evaluation,
construction, or final construction inspection;
(b) Either inspect the OSS before cover or allow the
designer of the OSS to perform the inspection before cover if
the designer is not also named as installer of the system.
(c) Keep the record drawings on file, with the approved
design documents.
(2) The person responsible for the final construction
inspection shall assure the OSS meets the approved design.
[Statutory Authority: RCW 43.20.050. 05-15-119, §
246-272A-0260, filed 7/18/05, effective 7/1/07.]