WAC 246-231-180
Inspection, test, and operating status. (1) The licensee, certificate holder, and applicant for a CoC
shall establish measures to indicate, by the use of markings
such as stamps, tags, labels, routing cards, or other suitable
means, the status of inspections and tests performed upon
individual items of the packaging. These measures must
provide for the identification of items that have
satisfactorily passed required inspections and tests, where
necessary to preclude inadvertent bypassing of the inspections
and tests.
(2) The licensee shall establish measures to identify the
operating status of components of the packaging, such as
tagging valves and switches, to prevent inadvertent operation.
[Statutory Authority: RCW 70.98.050. 08-09-093, §
246-231-180, filed 4/18/08, effective 5/19/08.]