WAC 194-22-040
Initiation of load curtailment. The state,
in consultation with regional state and utility contacts, will
determine if curtailment is required, and if so, the appropriate
initial stage. It is the intent of the state to initiate
statewide curtailment concurrent with Oregon, Idaho, and Montana,
leading to an effective regional curtailment and consistent
implementation policies. The state will formally notify the
utility coordinator and all electric utilities operating within
the state of Washington that regional and statewide electric load
curtailment are in effect. If any stage associated with a
specific level of curtailment is declared (Stages 2-5), the state
will publicly announce the need for curtailment and provide all
utilities operating within the state of Washington with written
instructions regarding utility obligations during the period of
state-initiated load curtailment. Upon notification by the
state, utilities shall immediately initiate curtailment on their
own systems in conformance with this plan.
[Statutory Authority: RCW 43.21F.045. 94-20-103, § 194-22-040,
filed 10/4/94, effective 11/4/94.]