WAC 173-495-070
Permit requirements. (1) Each weather
modification operation not specifically exempted by statute or
these regulations requires a permit. A separate permit must
be issued for each operation.
(2) A license holder desiring to conduct a weather
modification operation shall submit an application for a
permit to ecology.
(3) The permit applicant must hold a valid weather
modification license from the state of Washington.
(4) The applicant shall publish a notice of intention at
least once a week for three consecutive weeks in a newspaper
that has general circulation within the county in which the
operation is to be conducted or affected.
(5) The licensee shall file proof of publication of the
notice of intention with ecology within fifteen days from the
date of last publication of the notice.
(6) The notice of intention must contain at least the
following:
(a) The name and address of the licensee;
(b) The nature and object of the intended operation and
the person or organization on whose behalf it is to be
conducted;
(c) The area in which and the appropriate time during
which the operation will be conducted;
(d) The area intended to be affected by the operation;
and
(e) The materials and methods to be used in conducting
the operation.
(7) The applicant shall furnish proof of financial
responsibility, as described in WAC 173-495-120 of this
chapter.
(8) The applicant shall pay a permit fee outlined in chapter 173-455 WAC.
(9) Before issuing a permit, ecology shall state, in
writing, that the weather modification and control activities
proposed have been determined to be for the general welfare
and public good.
(10) Ecology shall hold a public hearing before any
weather modification permit is issued.
[Statutory Authority: RCW 70.94.181, [70.94.]152,[70.94.]331
, [70.94.]650, [70.94.]745, [70.94.]892,[70.94.]011
. 07-19-005 (Order 07-10), § 173-495-070, filed
9/6/07, effective 10/7/07. Statutory Authority: RCW 79.94.331, chapters 70.94 and 43.37 RCW. 00-01-009 (Order
99-14), § 173-495-070, filed 12/3/99, effective 1/3/00. Statutory Authority: RCW 70.94.331. 90-19-062 (Order 90-10),
§ 173-495-070, filed 9/17/90, effective 10/18/90; Order DE
77-29, § 173-495-070, filed 12/29/77. Formerly chapter 508-20
WAC.]