WAC 173-407-310
Relationship of ecology and Washington
utilities and transportation commission under Part II. (1)
The Washington utilities and transportation commission
(commission) shall consult with ecology to apply the
procedures adopted by the department to verify the emissions
of greenhouse gases from baseload electric generation under
RCW 80.80.040. Ecology shall report to the commission whether
baseload electric generation will comply with the greenhouse
gases emissions performance standard for the duration of the
period the baseload electric generation is supplied to the
electrical company. (RCW 80.80.060(7).)
(2) Ecology's consultation with the commission:
(a) In assisting the commission to apply the emissions
verification procedures adopted, ecology will compare the
commission's procedures to the ecology procedures found in WAC 173-407-130, 173-407-140, and 173-407-230.
(b) In consulting with the commission to determine if a
long-term financial commitment for baseload electric
generation meets the greenhouse gases emissions performance
standard, ecology shall consider whether the commitment meets
WAC 173-407-300.
(3) When conducting the consultation and reporting
processes, ecology will conclude this process of consultation
and assistance within thirty days of receiving all necessary
information from the commission to determine compliance.
[Statutory Authority: Chapter 80.80 RCW. 08-14-011 (Order
07-11), § 173-407-310, filed 6/19/08, effective 7/20/08.]