WAC 173-400-101
Registration issuance. (1) General. Any person operating or responsible for the operation of an
air contaminant source for which registration and reporting
are required shall register the source emission unit with the permitting authority. The owner or
operator shall make reports containing information as may be
required by the permitting authority concerning
location, size and height of contaminant outlets, processes
employed, nature and quantity of the air contaminant emission
and such other information as is relevant to air pollution and
available or reasonably capable of being assembled.
(2) Registration form. Registration information shall be
provided on forms supplied by the permitting
authority and shall be completed and returned within the time
specified on the form. Emission units within the facility
shall be listed separately unless the
permitting authority determines that certain emission units
may be combined into process streams for purposes of
registration and reporting.
(3) Signatory responsibility. The owner, operator, or
their designated management representative shall sign the
registration form for each source. The owner or operator of
the source shall be responsible for notifying the permitting authority of the existence of the source, and
for the accuracy, completeness, and timely submittal of
registration reporting information and any accompanying fee.
(4) Operational and maintenance plan. Owners or
operators of registered sources within ecology's jurisdiction
shall maintain an operation and maintenance plan for process
and control equipment. The plan shall reflect good industrial
practice and shall include a record of performance and
periodic inspections of process and control equipment. In
most instances, a manufacturer's operations manual or an
equipment operation schedule may be considered a sufficient
operation and maintenance plan. The plan shall be reviewed
and updated by the source owner or operator at least annually.
A copy of the plan shall be made available to ecology upon
request.
(5) Report of closure. A report of closure shall be
filed with the permitting authority within
ninety days after operations producing emissions permanently
cease at any applicable source under this section.
(6) Report of change of ownership. A new owner or
operator shall report to the permitting
authority within ninety days of any change of ownership or
change in operator.
(7) Operating permit program source exemption. Permit
program sources, as defined in RCW 70.94.030(18), are
not required to comply with the registration requirements of
WAC 173-400-100 through 173-400-104.
[Statutory Authority: Chapter 70.94 RCW. 11-06-060 (Order
09-01), § 173-400-101, filed 3/1/11, effective 4/1/11;
95-07-126 (Order 93-40), § 173-400-101, filed 3/22/95,
effective 4/22/95; 94-10-042 (Order 93-39), § 173-400-101,
filed 4/29/94, effective 5/30/94.]