| Note: | MSWLF units that do not accept waste on or after the effective date of this chapter, and close under chapter 173-304 WAC, Minimum functional standards for solid waste handling, and the federal rules for closure under 40 CFR Part 258.60 would continue to be permitted under chapter 173-304 WAC unless such MSWLF units are part of a multiunit groundwater monitoring system according to WAC 173-351-450(4). |
| Note: | See also WAC 173-351-720 (6)(a), filing for reissuance. |
| Note: | Any owner or operator planning to incorporate a 50 percent increase or greater in design volume capacity not previously authorized in permit, or unpermitted changes resulting in significant adverse environmental impacts that have lead a responsible official to issue a declaration of significance under WAC 197-11-736 shall meet the requirements of this section before construction has begun and before waste is accepted to the MSWLF unit, or lateral expansion. |
| Note: | MSWLF units not covered under corrective action are not exempted from permitting under this section. |