WAC 173-351-210
Plan of operation. Each owner or operator shall develop, keep, and abide by a plan of operation approved as part of the permitting process in WAC 173-351-700. The plan of operation shall describe the facilities' operation and shall convey to site operating personnel the concept of operation intended by the designer. The plan of operation shall be available for inspection at the request of the jurisdictional health officer. The facility must be operated in accordance with the plan of operation or the plan must be so modified with the approval of the jurisdictional health department.
Each plan of operation shall include:
(1) How solid wastes are to be handled on-site during its active life including transportation, routine filling, grading, cover, and housekeeping;
(2) How inspections are conducted and their frequency;
(3) Actions to take if there is a fire or explosion;
(4) Actions to take for sudden releases (e.g., failure of run-off containment system);
(5) How equipment such as leachate collection and gas collection equipment are to be operated and maintained;
(6) A safety plan or procedure; and
(7) Other such details as required by the jurisdictional health department.
[Statutory Authority: Chapter 70.95 RCW and 40 CFR 258. 93-22-016, § 173-351-210, filed 10/26/93, effective 11/26/93.]