WAC 173-350-715
General permit application requirements. (1) Every permit application shall be on a format supplied by
the department and shall contain the following information:
(a) Contact information for the facility owner, and the
facility operator and property owner if different, including
contact name, company name, mailing address, phone fax, and
e-mail;
(b) Identification of the type of facility that is to be
permitted;
(c) Identification of any other permit (local, state or
federal) in effect at the site;
(d) A vicinity plan or map (having a minimum scale of
1:24,000) that shall show the area within one mile (1.6 km) of
the property boundaries of the facility in terms of the
existing and proposed zoning and land uses within that area,
residences, and access roads, and other existing and proposed
man-made or natural features that may impact the operation of
the facility;
(e) Evidence of compliance with chapter 197-11 WAC, SEPA
rules;
(f) Information as required under the appropriate
facility permit application subsection of this chapter; and
(g) Any additional information as requested by the
jurisdictional health department or the department.
(2) Engineering plans, reports, specifications, programs,
and manuals submitted to the jurisdictional health department
or the department shall be prepared and certified by an
individual licensed to practice engineering in the state of
Washington, in an engineering discipline appropriate for the
solid waste facility type or activity.
(3) Signature and verification of applicants:
(a) All applications for permits shall be accompanied by
evidence of authority to sign the application and shall be
signed by the owner or operator as follows:
(i) In the case of corporations, by a duly authorized
principal executive officer of at least the level of
vice-president; in the case of a partnership or limited
partnership, by:
(A) A general partner;
(B) Proprietor; or
(C) In case of sole proprietorship, by the proprietor;
(ii) In the case of a municipal, state, or other
government entity, by a duly authorized principal executive
officer or elected official.
(b) Applications shall be signed or attested to by, or on
behalf of, the owner or operator, in respect to the veracity
of all statements therein; or shall bear an executed statement
by, or on behalf of, the owner or operator to the effect that
false statements made therein are made under penalty of
perjury.
(c) The signature of the applicant shall be notarized on
the permit application form.
[Statutory Authority: Chapter 70.95 RCW. 03-03-043 (Order
99-24), § 173-350-715, filed 1/10/03, effective 2/10/03.]