Modifications
|
Class
|
| A. General Permit Provisions |
| 1. Administrative and informational changes . . . . . . . . . . . . |
1 |
| 2. Correction of typographical errors . . . . . . . . . . . . |
1 |
| 3. Equipment replacement or upgrading with
functionally equivalent components (e.g., pipes,
valves, pumps, conveyors, controls) . . . . . . . . . . . . |
1 |
| 4. Changes in the frequency of or procedures
for monitoring, reporting, sampling, or maintenance
activities by the permittee: |
|
| a. To provide for more frequent monitoring,
reporting, sampling, or maintenance . . . . . . . . . . . . |
1 |
| b. Other changes . . . . . . . . . . . . |
2 |
| 5. Schedule of compliance: |
|
| a. Changes in interim compliance dates, with
prior approval of the director . . . . . . . . . . . . |
11 |
| b. Extension of final compliance date . . . . . . . . . . . . |
3 |
| 6. Changes in expiration date of permit to allow
earlier permit termination, with prior approval of the
director . . . . . . . . . . . . |
11 |
| 7. Changes in ownership or operational control
of a facility, provided the procedures of subsection
(2)(b) of this section are followed . . . . . . . . . . . . |
11 |
| 8. Changes to remove permit conditions that
are no longer applicable (i.e., because the standards
upon which they are based are no longer applicable
to the facility). |
11 |
| B. General Facility Standards |
| 1. Changes to waste sampling or analysis
methods: |
|
| a. To conform with agency guidance or
regulations . . . . . . . . . . . . |
1 |
| b. To incorporate changes associated with F039
(multisource leachate) sampling or analysis methods
. . . . . . . . . . . . |
11 |
| c. To incorporate changes associated with
underlying dangerous constituents in ignitable or
corrosive wastes . . . . . . . . . . . . |
11 |
| d. Other changes . . . . . . . . . . . . |
2 |
| 2. Changes to analytical quality
assurance/control plan: |
|
| a. To conform with agency guidance or
regulations . . . . . . . . . . . . |
1 |
| b. Other changes . . . . . . . . . . . . |
2 |
| 3. Changes in procedures for maintaining the
operating record . . . . . . . . . . . . |
1 |
| 4. Changes in frequency or content of
inspection schedules . . . . . . . . . . . . |
2 |
| 5. Changes in the training plan: |
|
| a. That affect the type or decrease the amount
of training given to employees . . . . . . . . . . . . |
2 |
| b. Other changes . . . . . . . . . . . . |
1 |
| 6. Contingency plan: |
|
| a. Changes in emergency procedures (i.e., spill
or release response procedures) . . . . . . . . . . . . |
2 |
| b. Replacement with functionally equivalent
equipment, upgrade, or relocate emergency
equipment listed . . . . . . . . . . . . |
1 |
| c. Removal of equipment from emergency
equipment list . . . . . . . . . . . . |
2 |
| d. Changes in name, address, or phone number
of coordinators or other persons or agencies
identified in the plan . . . . . . . . . . . . |
1 |
| 7. Construction quality assurance plan: |
|
| a. Changes that the CQA officer certifies in the
operating record will provide equivalent or better
certainty that the unit components meet the design
specification . . . . . . . . . . . . |
1 |
| b. Other changes . . . . . . . . . . . . |
2 |
| C. Groundwater Protection |
| 1. Changes to wells: |
|
| a. Changes in the number, location, depth, or
design of upgradient or downgradient wells of
permitted groundwater monitoring system . . . . . . . . . . . . |
2 |
| b. Replacement of an existing well that has been
damaged or rendered inoperable, without change to
location, design, or depth of the well . . . . . . . . . . . . |
1 |
| 2. Changes in groundwater sampling or analysis
procedures or monitoring schedule, with prior
approval of the director . . . . . . . . . . . . |
11 |
| 3. Changes in statistical procedure for
determining whether a statistically significant change
in groundwater quality between upgradient and
downgradient wells has occurred, with prior approval
of the director . . . . . . . . . . . . |
11 |
| 4. Changes in point of compliance . . . . . . . . . . . . |
2 |
| 5. Changes in indicator parameters, hazardous
constituents, or concentration limits (including
ACLs): |
|
a. As specified in the groundwater protection
standard . . . . . . . . . . . . |
3 |
b. As specified in the detection monitoring
program . . . . . . . . . . . . |
2 |
| 6. Changes to a detection monitoring program as
required by WAC 173-303-645 (9)(h), unless
otherwise specified in this appendix . . . . . . . . . . . . |
2 |
| 7. Compliance monitoring program: |
|
| a. Addition of compliance monitoring program as
required by WAC 173-303-645 (9)(g)(iv) and (10) . . . . . . . . . . . . |
3 |
| b. Changes to a compliance monitoring program
as required by WAC 173-303-645 (10)(j), unless
otherwise specified in this appendix . . . . . . . . . . . . |
2 |
| 8. Corrective action program: |
|
a. Addition of a corrective action program as
required by WAC 173-303-645 (10)(h)(ii) and (11) . . . . . . . . . . . . |
3 |
b. Changes to a corrective action program as
required by WAC 173-303-645 (11)(h), unless
otherwise specified in this appendix . . . . . . . . . . . . |
2 |
| D. Closure |
|
| 1. Changes to the closure plan: |
|
| a. Changes in estimate of maximum extent of
operations or maximum inventory of waste on-site at
any time during the active life of the facility, with
prior approval of the director . . . . . . . . . . . . |
11 |
| b. Changes in the closure schedule for any unit,
changes in the final closure schedule for the facility,
or extension of the closure period, with prior approval
of the director . . . . . . . . . . . . |
11 |
| c. Changes in the expected year of final closure,
where other permit conditions are not changed, with
prior approval of the director . . . . . . . . . . . . |
11 |
| d. Changes in procedures for decontamination of
facility equipment or structures, with prior approval of
the director . . . . . . . . . . . . |
11 |
| e. Changes in approved closure plan resulting
from unexpected events occurring during partial or
final closure, unless otherwise specified in this
appendix . . . . . . . . . . . . |
2 |
| f. Extension of the closure period to allow a
landfill, surface impoundment, or land treatment unit
to receive nondangerous wastes after final receipt of
dangerous wastes under WAC 173-303-610 (4)(d) and
(e) . . . . . . . . . . . . |
2 |
2. Creation of a new landfill unit as part of
closure . . . . . . . . . . . . |
3 |
| 3. Addition of the following new units to be used
temporarily for closure activities: |
|
| a. Surface impoundments . . . . . . . . . . . . |
3 |
| b. Incinerators . . . . . . . . . . . . |
3 |
| c. Waste piles that do not comply with WAC 173-303-660 (1)(c) . . . . . . . . . . . . |
3 |
| d. Waste piles that comply with WAC 173-303-660 (1)(c) . . . . . . . . . . . . |
2 |
e. Tanks or containers (other than specified
below) . . . . . . . . . . . . |
2 |
| f. Tanks used for neutralization, dewatering,
phase separation, or component separation, with prior
approval of the director . . . . . . . . . . . . |
11 |
| g. Staging piles . . . . . . . . . . . . |
2 |
| E. Post-Closure |
|
| 1. Changes in name, address, or phone number of
contact in post-closure plan . . . . . . . . . . . . |
1 |
| 2. Extension of post-closure care period . . . . . . . . . . . . |
2 |
| 3. Reduction in the post-closure care period . . . . . . . . . . . . |
3 |
| 4. Changes to the expected year of final closure,
where other permit conditions are not changed . . . . . . . . . . . . |
1 |
| 5. Changes in post-closure plan necessitated by
events occurring during the active life of the facility,
including partial and final closure . . . . . . . . . . . . |
2 |
| F. Containers |
|
| 1. Modification or addition of container units: |
|
| a. Resulting in greater than 25% increase in the
facility's container storage capacity, except as
provided in F (1)(c) and F (4)(a) below . . . . . . . . . . . . |
3 |
| b. Resulting in up to 25% increase in the facility's
container storage capacity, except as provided in F
(1)(c) and F (4)(a) below . . . . . . . . . . . . |
2 |
| c. Or treatment processes necessary to treat
wastes that are restricted from land disposal to meet
some or all of the applicable treatment standards or to
treat wastes to satisfy (in whole or in part) the
standard of "use of practically available technology
that yields the greatest environmental benefit"
contained in 40 CFR 268.8 (a)(2)(ii), with prior
approval of the director. This modification may also
involve addition of new waste codes or narrative
descriptions of wastes. It is not applicable to
dioxin-containing wastes (F020, 021, 022, 023, 026,
027, and 028) . . . . . . . . . . . . |
11 |
| 2. |
|
| a. Modification of a container unit without
increasing the capacity of the unit . . . . . . . . . . . . |
2 |
| b. Addition of a roof to a container unit without
alteration of the containment system . . . . . . . . . . . . |
1 |
| 3. Storage of different wastes in containers: |
|
| a. That require additional or different
management practices from those authorized in the
permit, except as provided in F(4) below . . . . . . . . . . . . |
3 |
| b. That do not require additional or different
management practices from those authorized in the
permit . . . . . . . . . . . . |
2 |
| 4. Storage or treatment of different wastes in
containers: |
|
| a. That require addition of units or change in
treatment process or management standards,
provided that the wastes are restricted from land
disposal and are to be treated to meet some or all
of the applicable treatment standards, or that are to
be treated to satisfy (in whole or in part) the
standard of "use of practically available
technology that yields the greatest environmental
benefit" contained in 40 CFR 268.8 (a)(2)(ii). This
modification is not applicable to dioxin-containing
wastes (F020, 021, 022, 023, 026, 027, and 028) . . . . . . . . . . . . |
11 |
| b. That do not require the addition of units or
a change in the treatment process or management
standards, and provided that the units have
previously received wastes of the same type (e.g.,
incinerator scrubber water). This modification is
not applicable to dioxin-containing wastes (F020,
021, 022, 023, 026, 027, and 028) . . . . . . . . . . . . |
11 |
| G. Tanks |
|
| 1. |
|
| a. Modification or addition of tank units
resulting in greater than 25% increase in the
facility's tank capacity, except as provided in G
(1)(c), G (1)(d), and G (1)(e) below . . . . . . . . . . . . |
3 |
| b. Modification or addition of tank units
resulting in up to 25% increase in the facility's tank
capacity, except as provided in G (1)(d) and G
(1)(e) below . . . . . . . . . . . . |
2 |
| c. Addition of a new tank that will operate for
more than 90 days using any of the following
physical or chemical treatment technologies:
Neutralization, dewatering, phase separation, or
component separation . . . . . . . . . . . . |
2 |
| d. After prior approval of the director, addition
of a new tank that will operate for up to 90 days
using any of the following physical or chemical
treatment technologies: Neutralization,
dewatering, phase separation, or component
separation . . . . . . . . . . . . |
11 |
| e. Modification or addition of tank units or
treatment processes necessary to treat wastes that
are restricted from land disposal to meet some or
all of the applicable treatment standards or to treat
wastes to satisfy (in whole or in part) the standard
of "use of practically available technology that
yields the greatest environmental benefit"
contained in 40 CFR 268.8 (a)(2)(ii), with prior
approval of the director. This modification may
also involve addition of new waste codes. It is not
applicable to dioxin-containing wastes (F020, 021,
022, 023, 026, 027, and 028) . . . . . . . . . . . . |
11 |
| 2. Modification of a tank unit or secondary
containment system without increasing the
capacity of the unit . . . . . . . . . . . . |
2 |
| 3. Replacement of a tank with a tank that
meets the same design standards and has a
capacity within +/- 10% of the replaced tank
provided . . . . . . . . . . . . |
1 |
| -The capacity difference is no more than 1500
gallons, |
|
| -The facility's permitted tank capacity is not
increased, and |
|
| -The replacement tank meets the same
conditions in the permit. |
|
| 4. Modification of a tank management practice
. . . . . . . . . . . . |
2 |
| 5. Management of different wastes in tanks: |
|
| a. That require additional or different
management practices, tank design, different fire
protection specifications, or significantly different
tank treatment process from that authorized in the
permit, except as provided in G (5)(c) below . . . . . . . . . . . . |
3 |
| b. That do not require additional or different
management practices, tank design, different fire
protection specifications, or significantly different
tank treatment process than authorized in the
permit, except as provided in G (5)(d) . . . . . . . . . . . . |
2 |
| c. That require addition of units or change in
treatment processes or management standards,
provided that the wastes are restricted from land
disposal and are to be treated to meet some or all
of the applicable treatment standards or that are to
be treated to satisfy (in whole or in part) the
standard of "use of practically available
technology that yields the greatest environmental
benefit" contained in 40 CFR 268.8 (a)(2)(ii). The
modification is not applicable to dioxin-containing
wastes (F020, 021, 022, 023, 026, 027, and 028) . . . . . . . . . . . . |
11 |
| (d) That do not require the addition of units or
a change in the treatment process or management
standards, and provided that the units have
previously received waste of the same type (e.g.,
incinerator scrubber water). This modification is
not applicable to dioxin-containing wastes (F020,
021, 022, 023, 026, 027, and 028) . . . . . . . . . . . . |
1 |
| H. Surface Impoundments |
|
| 1. Modification or addition of surface
impoundment units that result in increasing the
facility's surface impoundment storage or
treatment capacity . . . . . . . . . . . . |
3 |
| 2. Replacement of a surface impoundment
unit . . . . . . . . . . . . |
3 |
| 3. Modification of a surface impoundment
unit without increasing the facility's surface
impoundment storage or treatment capacity and
without modifying the unit's liner, leak detection
system, or leachate collection system . . . . . . . . . . . . |
2 |
| 4. Modification of a surface impoundment
management practice . . . . . . . . . . . . |
2 |
| 5. Treatment, storage, or disposal of different
wastes in surface impoundments: |
|
| a. That require additional or different
management practices or different design of the
liner or leak detection system than authorized in
the permit . . . . . . . . . . . . |
3 |
| b. That do not require additional or different
management practices or different design of the
liner or leak detection system than authorized in
the permit . . . . . . . . . . . . |
2 |
| c. That are wastes restricted from land
disposal that meet the applicable treatment
standards or that are treated to satisfy the
standard of "use of practically available
technology that yields the greatest environmental
benefit" contained in 40 CFR 268.8 (a)(2)(ii), and
provided that the unit meets the minimum
technological requirements stated in 40 CFR 268.5
(h)(2). This modification is not applicable to
dioxin-containing wastes (F020, 021, 022, 023, 026,
027, and 028) . . . . . . . . . . . . |
1 |
| d. That are residues from wastewater
treatment or incineration, provided that disposal
occurs in a unit that meets the minimum
technological requirements stated in 40 CFR 268.5
(h)(2), and provided further that the surface
impoundment has previously received wastes of
the same type (for example, incinerator scrubber
water). This modification is not applicable to
dioxin-containing wastes (F020, 021, 022, 023, 026,
027, and 028) . . . . . . . . . . . . |
1 |
| 6. Modifications of unconstructed units to
comply with WAC 173-303-650 (2)(j), (10), (11),
and (4)(d) . . . . . . . . . . . . |
11 |
| 7. Changes in response action plan: |
|
| a. Increase in action leakage rate . . . . . . . . . . . . |
3 |
| b. Change in a specific response reducing its
frequency or effectiveness . . . . . . . . . . . . |
3 |
| c. Other changes . . . . . . . . . . . . |
2 |
| J. Landfills and Unenclosed Waste Piles |
|
| 1. Modification or addition of landfill units that
result in increasing the facility's disposal capacity . . . . . . . . . . . . |
3 |
| 2. Replacement of a landfill . . . . . . . . . . . . |
3 |
| 3. Addition or modification of a liner, leachate
collection system, leachate detection system, runoff
control, or final cover system . . . . . . . . . . . . |
3 |
| 4. Modification of a landfill unit without
changing a liner, leachate collection system, leachate
detection system, runoff control, or final cover
system . . . . . . . . . . . . |
2 |
5. Modification of a landfill management
practice . . . . . . . . . . . . |
2 |
| 6. Landfill different wastes: |
|
| a. That require additional or different
management practices, different design of the liner,
leachate collection system, or leachate detection
system . . . . . . . . . . . . |
3 |
| b. That do not require additional or different
management practices, different design of the liner,
leachate collection system, or leachate detection
system . . . . . . . . . . . . |
2 |
| c. That are wastes restricted from land disposal
that meet the applicable treatment standards or that
are treated to satisfy the standard of "use of
practically available technology that yields the
greatest environmental benefit" contained in 40 CFR
268.8 (a)(2)(ii), and provided that the landfill unit
meets the minimum technological requirements stated
in 40 CFR 268.5 (h)(2). This modification is not
applicable to dioxin-containing wastes (F020, 021, 022,
023, 026, 027, and 028) . . . . . . . . . . . . |
1 |
| d. That are residues from wastewater treatment or
incineration, provided that disposal occurs in a
landfill unit that meets the minimum technological
requirements stated in 40 CFR 268.5 (h)(2), and
provided further that the landfill has previously
received wastes of the same type (for example,
incinerator ash). This modification is not applicable
to dioxin-containing wastes (F020, 021, 022, 023, 026,
027, and 028) . . . . . . . . . . . . |
1 |
| 7. Modifications of unconstructed units to
comply with WAC 173-303-660 (2)(j), (11), (12), (5)(c),
173-303-665 (2)(h), (8), (4)(c), and (9) . . . . . . . . . . . . |
11 |
| 8. Changes in response action plan: |
|
| a. Increase in action leakage rate . . . . . . . . . . . . |
3 |
| b. Change in a specific response reducing its
frequency or effectiveness. . . . . . . . . . . . . |
3 |
| c. Other changes . . . . . . . . . . . . |
2 |
| 6. Modification of a land treatment unit
management practice to: |
|
a. Increase rate or change method of waste
application . . . . . . . . . . . . |
3 |
| b. Decrease rate of waste application . . . . . . . . . . . . |
2 |
| 7. Modification of a land treatment unit
management practice to change measures of pH or
moisture content, or to enhance microbial or chemical
reactions . . . . . . . . . . . . |
2 |
| 8. Modification of a land treatment unit
management practice to grow food chain crops, to
add to or replace existing permitted crops with
different food chain crops, or to modify operating
plans for distribution of animal feeds resulting from
such crops . . . . . . . . . . . . |
3 |
| 9. Modification of operating practice due to
detection of releases from the land treatment unit
pursuant to WAC 173-303-655 (6)(g)(ii) . . . . . . . . . . . . |
3 |
| 10. Changes in the unsaturated zone monitoring
system, resulting in a change to the location, depth,
number of sampling points, or replace unsaturated
zone monitoring devices or components of devices
with devices or components that have specifications
different from permit requirements . . . . . . . . . . . . |
3 |
| 11. Changes in the unsaturated zone monitoring
system that do not result in a change to the location,
depth, number of sampling points, or that replace
unsaturated zone monitoring devices or components
of devices with devices or components having
specifications different from permit requirements . . . . . . . . . . . . |
2 |
| 12. Changes in background values for hazardous
constituents in soil and soil-pore liquid . . . . . . . . . . . . |
2 |
| 13. Changes in sampling, analysis, or statistical
procedure . . . . . . . . . . . . |
2 |
| 14. Changes in land treatment demonstration
program prior to or during the demonstration . . . . . . . . . . . . |
2 |
| 15. Changes in any condition specified in the
permit for a land treatment unit to reflect results of the
land treatment demonstration, provided performance
standards are met, and the director's prior approval
has been received . . . . . . . . . . . . |
2 |
| 16. Changes to allow a second land treatment
demonstration to be conducted when the results of
the first demonstration have not shown the
conditions under which the wastes can be treated
completely, provided the conditions for the second
demonstration are substantially the same as the
conditions for the first demonstration and have
received the prior approval of the director . . . . . . . . . . . . |
2 |
| 17. Changes to allow a second land treatment
demonstration to be conducted when the results of
the first demonstration have not shown the
conditions under which the wastes can be treated
completely, where the conditions for the second
demonstration are not substantially the same as the
conditions for the first demonstration . . . . . . . . . . . . |
3 |
| 18. Changes in vegetative cover requirements for
closure . . . . . . . . . . . . |
2 |
| L. Incinerators, Boilers, and Industrial Furnaces |
|
| 1. Changes to increase by more than 25% any of
the following limits authorized in the permit: A
thermal feed rate limit, a feedstream feed rate limit, a
chlorine/chloride feed rate limit, a metal feed rate limit,
or an ash feed rate limit. The director will require a
new trial burn to substantiate compliance with the
regulatory performance standards unless this
demonstration can be made through other means . . . . . . . . . . . . |
3 |
| 2. Changes to increase by up to 25% any of the
following limits authorized in the permit: A thermal
feed rate limit, a feedstream feed rate limit, a
chlorine/chloride feed rate limit, a metal feed rate limit,
or an ash feed rate limit. The director will require a
new trial burn to substantiate compliance with the
regulatory performance standards unless this
demonstration can be made through other means . . . . . . . . . . . . |
2 |
| 3. Modification of an incinerator, boiler, or
industrial furnace unit by changing the internal size or
geometry of the primary or secondary combustion
units, by adding a primary or secondary combustion
unit, by substantially changing the design of any
component used to remove HC1/C12, metals, or
particulate from the combustion gases, or by
changing other features of the incinerator, boiler, or
industrial furnace that could affect its capability to
meet the regulatory performance standards. The
director will require a new trial burn to substantiate
compliance with the regulatory performance
standards unless this demonstration can be made
through other means . . . . . . . . . . . . |
3 |
| 4. Modification of an incinerator, boiler, or
industrial furnace unit in a manner that would not
likely affect the capability of the unit to meet the
regulatory performance standards but which would
change the operating conditions or monitoring
requirements specified in the permit. The director
may require a new trial burn to demonstrate
compliance with the regulatory performance
standards . . . . . . . . . . . . |
2 |
| 5. Operating requirements: |
|
| a. Modification of the limits specified in the
permit for minimum or maximum combustion gas
temperature, minimum combustion gas residence time,
oxygen concentration in the secondary combustion
chamber flue gas carbon monoxide and hydrocarbon
concentration, maximum temperature at the inlet to the
particulate matter emission control system, or
operating parameters for the air pollution control
system. The director will require a new trial burn to
substantiate compliance with the regulatory
performance standards unless this demonstration can
be made through other means . . . . . . . . . . . . |
3 |
| b. Modification of any stack gas emission limits
specified in the permit, or modification of any
conditions in the permit concerning emergency
shutdown or automatic waste feed cutoff procedures
or controls . . . . . . . . . . . . |
3 |
| c. Modification of any other operating condition
or any inspection or recordkeeping requirement
specified in the permit . . . . . . . . . . . . |
2 |
| 6. Burning different wastes: |
|
| a. If the waste contains a POHC that is more
difficult to burn than authorized by the permit or if
burning of the waste requires compliance with
different regulatory performance standards than
specified in the permit. The director will require a new
trial burn to substantiate compliance with the
regulatory performance standards unless this
demonstration can be made through other means . . . . . . . . . . . . |
3 |
| b. If the waste does not contain a POHC that is
more difficult to burn than authorized by the permit
and if burning of the waste does not require
compliance with different regulatory performance
standards than specified in the permit . . . . . . . . . . . . |
2 |
| 7. Shakedown and trial burn: |
|
| a. Modification of the trial burn plan or any of the
permit conditions applicable during the shakedown
period for determining operational readiness after
construction, the trial burn period, or the period
immediately following the trial burn . . . . . . . . . . . . |
2 |
| b. Authorization of up to an additional 720 hours
of waste burning during the shakedown period for
determining operational readiness after construction,
with the prior approval of the director . . . . . . . . . . . . |
11 |
| c. Changes in the operating requirements set in
the permit for conducting a trial burn, provided the
change is minor and has received the prior approval
of the director . . . . . . . . . . . . |
11 |
| d. Changes in the ranges of the operating
requirements set in the permit to reflect the results of
the trial burn, provided the change is minor and has
received the prior approval of the director . . . . . . . . . . . . |
11 |
| 8. Substitution of an alternate type of
nondangerous fuel that is not specified in the permit . . . . . . . . . . . . |
1 |
| 9. Technology changes needed to meet
standards under 40 CFR part 63 (subpart
EEE-National Emission Standards for Hazardous Air
Pollutants from Hazardous Waste Combustors), that
are incorporated by reference at WAC 173-400-075
(5)(a) provided the procedures of WAC 173-303-830
(4)(j) are followed. |
11 |
| 10. Changes to dangerous waste permit
provisions needed to support transition to 40 CFR
part 63 (Subpart EEE-National Emission Standards for
Hazardous Air Pollutants From Hazardous Waste
Combustors) provided the procedures of (4)(k) of this
section are followed. |
11 |
| M. Containment Buildings |
|
| 1. Modification or addition of containment
building units: |
|
| a. Resulting in greater than 25% increase in the
facility's containment building storage or treatment
capacity. . . . . . . . . . . . . |
3 |
| b. Resulting in up to 25% increase in the facility's
containment building storage or treatment capacity. . . . . . . . . . . . . |
2 |
| 2. Modification of a containment building unit or
secondary containment system without increasing
the capacity of the unit. . . . . . . . . . . . . |
2 |
| 3. Replacement of a containment building with a
containment building that meets the same design
standards provided: |
|
| a. The unit capacity is not increased. . . . . . . . . . . . . |
1 |
| b. The replacement containment building meets
the same conditions in the permit. . . . . . . . . . . . . |
1 |
| 4. Modification of a containment building
management practice. . . . . . . . . . . . . |
2 |
| 5. Storage or treatment of different wastes in
containment buildings: |
|
| a. That require additional or different
management practices. . . . . . . . . . . . . |
3 |
| b. That do not require additional or different
management practices. . . . . . . . . . . . . |
2 |
| N. Corrective Action |
|
| 1. Approval of a corrective action management
unit pursuant to WAC 173-303-64640, 173-303-64650,
173-303-64660, and 173-303-64670 . . . . . . . . . . . . |
3 |
| 2. Approval of a temporary unit or time extension
for a temporary unit pursuant to WAC 173-303-64680 . . . . . . . . . . . . |
2 |
| 3. Approval of a staging pile or staging pile
operating term extension . . . . . . . . . . . . |
2 |
| 4. Modification to incorporate a corrective action
order issued pursuant to MTCA . . . . . . . . . . . . |
3 |
| 5. Modification or amendment of a corrective
action order issued pursuant to MTCA when the
MTCA public participation requirements are met and
order has already been incorporated by reference into
the permit . . . . . . . . . . . . |
1 |