WAC 173-182-820
Significant changes require
notification. (1) The PRC is responsible to provide written
notification to ecology and plan holders to whom they are
obligated, within twenty-four hours, of any significant change
in the information reported in the approved application. The
notice shall include the identification of back up resources
sufficient to maintain the PRC readiness level, and the
estimated date that the original equipment shall be back in
full service. Changes which are considered significant
include loss of equipment that affect the planning standard
spreadsheet of any plan holder covered by the PRC, personnel
identified in ICS positions by plan holders, changes in
equipment ownership, or a greater than ten percent decrease in
available spill response equipment. Failure to report changes
could result in the loss of PRC approval. Notification by
facsimile or e-mail will be considered written notice.
(2) If ecology determines that PRC approval conditions
are no longer met, approval may be revoked or conditionally
modified. The PRC will receive a written notice of the loss
of approval or conditional modifications and a time period to
either appeal or correct the deficiency.
(3) Ecology will immediately notify plan holders of
changes in the approval status of PRCs.
[Statutory Authority: Chapters 88.46, 90.56, and 90.48 RCW. 06-20-035 (Order 00-03), § 173-182-820, filed 9/25/06,
effective 10/26/06.]