WAC 173-175-620
Enforcement. (1) In enforcement of this
chapter, the department may impose such sanctions as
appropriate under authorities vested in it, including but not
limited to, the issuance of regulatory orders under RCW 86.16.081 and 43.27A.190 and civil penalties under RCW 86.16.081 and 90.03.600.
(2) Any dam which is found to be under construction or
recently constructed without prior approval of the plans and
specifications is in violation of RCW 90.03.350 and will be
presumed to be a public nuisance. The owner will not be
allowed to fill the reservoir or continue to operate the
reservoir until the structural integrity and safety of the
facility can be demonstrated to the satisfaction of the
department. In addition:
(a) Regulatory orders may be issued to enforce the
restriction of reservoir filling and fines may be levied at
one hundred to five thousand dollars per day;
(b) Owners are required to submit as-built drawings and
all available documentation describing the manner in which the
dam or portion thereof was constructed;
(c) If the structural integrity and safety of a dam
project cannot be demonstrated or confirmed to the
satisfaction of the department, the owner shall not commence
or resume normal operation of the project until all
outstanding issues or problems are resolved to the
satisfaction of the department. To accomplish the above, the
department may:
(i) Order the outlet works to remain fully open and not
allow filling of the reservoir;
(ii) Restrict reservoir water levels or reservoir
operation;
(iii) Order the breaching of the impounding barrier;
(iv) Take other measures as appropriate to reasonably
assure safety to life and property.
(d) If, in the opinion of the department, the owner is
unwilling or incapable of resolving the outstanding safety
issues in a timely manner, the department may take action to
have the dam abated as prescribed by law under RCW 90.03.350.
(3)(a) In order to correct safety deficiencies and
exigency conditions as identified by the department on
existing dams, owners are required to take actions as
prescribed by the department to preserve the structural
stability and integrity of the project and attain levels of
safety in accordance with accepted engineering practice.
(b) If the owner does not take action to correct safety
issues in a timely manner, regulatory orders may be issued to
require modifications, and to restrict the filling of the
reservoir until all outstanding issues or problems are
resolved to the satisfaction of the department.
(c) If the owner continues to be unwilling or incapable
of resolving the outstanding safety issues, the department may
take action to have the dam abated as prescribed by law under
RCW 90.03.350.
[Statutory Authority: RCW 43.21A.064, 43.21A.080, 86.16.061,
90.03.350 and [90.03].470. 04-16-122 (Order 03-08), §
173-175-620, filed 8/4/04, effective 9/4/04. Statutory
Authority: RCW 43.21A.064, [43.21A.]080 and 86.16.061. 92-12-055 (Order 91-17), § 173-175-620, filed 6/1/92,
effective 7/2/92.]