WAC 173-175-500
Operation and maintenance. (1) The
owner shall develop and maintain a current operation and
maintenance (O&M) manual.
The manual shall describe procedures for operation of the
project under normal and extreme reservoir inflow conditions
and provide technical guidance and procedures for monitoring,
inspection, and long-term maintenance. Information on the
development of the O&M manual is contained in the department's
Dam Safety Guidelines. The O&M manual shall include, as a
minimum, the following items:
(a) Identification of the individual(s) responsible for
implementing the plan;
(b) A project data sheet describing the pertinent
features of the dam and reservoir, including the spillway(s),
outlet works, and appurtenant structures and their locations
at the dam site;
(c) The rules and procedures (rule curve) used to
regulate reservoir levels and project operation for various
reservoir inflows and for both normal and unusual seasonal
conditions;
(d) A description of each hydraulic element used to
regulate or release water, including information on proper
operation and scheduled maintenance;
(e) A listing of the items requiring periodic monitoring,
the frequency of monitoring and procedures for monitoring,
measurement, and recordkeeping;
(f) A listing of the items requiring periodic maintenance
and procedures for conducting and documenting maintenance and
recording of problems;
(g) A listing of items to be inspected or test operated,
the frequency and procedures for conducting the same and for
documenting the findings.
(2) It shall be the duty and responsibility of the owner
to, at all times, operate and maintain the dam and all
appurtenant works in a safe manner and condition and follow
the method and schedule of operation of the dam as outlined in
the O&M manual.
(3) Any proposed changes to the O&M manual which could
have an effect on public or project safety must be submitted
to the department for review and acceptance before
implementation.
(4) The OM manual must be updated within one hundred
eighty days after a periodic inspection has been completed by
the department.
[Statutory Authority: RCW 43.21A.064, 43.21A.080, 86.16.061,
90.03.350 and [90.03].470. 04-16-122 (Order 03-08), §
173-175-500, filed 8/4/04, effective 9/4/04. Statutory
Authority: RCW 43.21A.064, [43.21A.]080 and 86.16.061. 92-12-055 (Order 91-17), § 173-175-500, filed 6/1/92,
effective 7/2/92.]