WAC 173-175-250
Construction records summary. Within
one hundred twenty days following completion of construction
or modification of a dam, the project engineer, as
representative of the owner, shall submit a report to the
department on construction activities which includes:
(1) A summary of results from field testing of materials
used in construction. The summary shall identify both
representative values and the range of test values;
(2) A discussion of any notable items encountered during
construction;
(3) One complete set of drawings describing the as-built
condition of the dam. These drawings shall be submitted in
both paper and electronic format.